15. Perform the commissioning steps as described in
Configuring the System on page 31.
Adding, Removing, or Replacing Power Optimizers
1. Turn OFF the inverter ON/OFF/P switch, and wait until the green LED is blinking ,
indicating that the DC voltage is safe (<50V), or wait five minutes before continuing
to the next step.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the
distribution panel.
3. Turn OFF the DC Safety Unit (if applicable).
4. Disconnect and connect the necessary power optimizers.
5. Perform pairing and other procedures described in
Configuring the System on page 31 on all inverters to which power optimizers were
added or from which power optimizers were removed.
6. In the monitoring platform, use the
Replace
button in the
logical
layout
tab (in site Admin). Replace the serial number of the removed
power optimizer with the serial number of the newly installed power
https://www.solaredge.com/sites/default/files/se-
monitoring-portal-site-admin.pdf
Appendix B: Replacing and Adding System Components