![SolarEdge SE10000H Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/solaredge/se10000h/se10000h_installation-manual_1313722046.webp)
Creating Logical and Physical Layout using Installation
Information
To display a logical layout, insert the inverter serial number in the new site created in
the monitoring platform. When the communication between the inverter and the
monitoring server is established, the logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power
optimizers. To map the locations, use one of the methods described in the next sections.
Designer
Designer recommends inverter and power optimizer selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/
Mapper Application
Use the Mapper smart phone application to scan the power optimizer
and inverter 2D bar-codes and create a virtual map of a PV site for
enhanced monitoring and easier maintenance.
The Mapper application is integrated with the monitoring platform and enables:
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the power optimizer serial number to the correct module in
the system physical layout.
For detailed information, refer to the
Mapper demo movies:
Creating new sites using the Mapper mobile application
Mapping existing sites using the Mapper mobile application
Chapter 5: Activating, Commissioning and Configuring the System
45
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00540-1.0