![SolarEdge SE10000H Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/solaredge/se10000h/se10000h_installation-manual_1313722036.webp)
The Energy Manager option is used for setting power export limitation, as
described in the
Export Limitation Application Note, available on the
https://www.solaredge.com/sites/default/files/feed-
in_limitation_application_note.pdf
Device Manager
From the
Commissioning
menu, select
Device Manager
to configure various system
Smart Energy Management devices.
For more information refer to
https://www.solaredge.com/products/device-control#/
Maintenance
From the
Commissioning
menu, select
Maintenance
to configure various
system settings, as described below.
Date and Time: Set the internal real-time clock. If connected to the monitoring
platform, the date and time are set automatically and only time zone should be set.
Reset Counters: Resets the accumulated energy counters that are sent to the
monitoring platform.
Factory Reset: Performs a general reset to the default device settings.
Firmware Upgrade: Perform a software upgrade.
Diagnostics: Displays the Isolation status and power optimizer status
screens. Refer to
https://www.solaredge.com/sites/default/files/application_note_
isolation_fault_troubleshooting.pdf
.
Activate Standby Mode
: Enables/disables Standby Mode - for remote
commissioning.
Grid Protection
: Available in specific countries. Enables viewing and setting grid
protection values.
Board Replacement
: Backs up and restores the system parameters, including energy
counters; Used during board replacement according to the instructions supplied
with replacement kits.
Chapter 5: Activating, Commissioning and Configuring the System
35
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00540-1.0