![SolarEdge SE-MTR240-NN-S-S1 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/solaredge/se-mtr240-nn-s-s1/se-mtr240-nn-s-s1_installation-manual_1313764017.webp)
To wire the meter:
Wire the meter in accordance with one of the connection diagrams below:
Split phase grid, see the figure
No-neutral grid, see the figure
If you are connecting the meter to a
revenue grade inverter (inverter with built-in
Installing Two Meters on page 35.
Figure 14: Split Phase Grid
NOTE
Clamp the CT connected to
L1 CT
around the wire connected to
ØL1
.
Clamp the CT connected to
L2 CT
around the wire connected to
ØL2
.
When clamping the CT around the conductor to be measured, make sure the
arrow is pointing towards the grid.
Energy Meter with Modbus Connection MAN-01-00270-1.3
16
Installing and Connecting the Meter
Содержание SE-MTR240-NN-S-S1
Страница 1: ...Installation Guide Energy Meter with Modbus Connection For North America Version 1 3...
Страница 47: ......