background image

11

Mounting with Clamps

Four or more corrosion-proof aluminum clamps should be used to fasten SF modules to the support structure. Center-line of the 
clamps shall be secured within at the indicated clamping zone (256 mm ± 75 mm) from the corners of the longer side of the module 
frame using stainless-steel M8 bolts with a minimum length of 20 mm. Tighten the clamps with an adequate torque value. *

1

All selected module clamps must be at least 50 mm long, 3 mm thick, and overlap the module frame by 8 mm or more.

Clamps must not create shadow nor cover the front glass, and shall not deform the module frames during installation. Please refer to 
the instructions provided by the clamp manufacturer for further instructions.

*

1

 

UL:

 Recommended tightening torque is 15 Nm (132.8 lb in) minimum.

TUV: 2,400 Pa (50 lbs/ft2) to the front and back of the module
UL: 1,600 Pa (33.4 lbs/ft2) to the front and back of the module

1.5 times the design load is applied to the module during UL testing. 2,400 Pa (50 lbs/ft2) is applied to test 1,600 Pa
(33.4 lbs/ft2) UL design load.

Module perpendicular to support rails

Array Installation (section) 

Landscape (horizontal)

 

Portrait (vertical) 

End clamp 

Middle clamp 

Module   

support rail

Bolt 

Module 

Module 

Nut

 

Module 

Module 

Module 

Clamp to module overlap 

min 8 mm 

8mm   

8 mm   

3 mm   

3 mm

 

256 mm 

745 mm 

75 mm  75 mm 

75 mm  75 mm 

75 mm  75 mm 

75 mm 

75 mm 

75

m

75

m

75

m

m

 

75

m

m

 

75

m

m

 

75

m

m

 

74

5

m

25

6

m

75

m

75

m

Array Installation (section) 

Landscape (horizontal)

 

Portrait (vertical) 

End clamp 

Middle clamp 

Module   

support rail

Bolt 

Module 

Module 

Nut

 

Module 

Module 

Module 

Clamp to module overlap 

min 8 mm 

8mm   

8 mm   

3 mm   

3 mm

 

256 mm 

745 mm 

75 mm  75 mm 

75 mm  75 mm 

75 mm  75 mm 

75 mm 

75 mm 

75

m

75

m

75

m

m

 

75

m

m

 

75

m

m

 

75

m

m

 

74

5

m

25

6

m

75

m

75

m

Содержание SF140-S

Страница 1: ...Solar Frontier Europe GmbH Data Sheet and Installation and Maintenance Manual SF140 S SF145 S SF150 S SF155 S SF160 S SF165 S SF170 S ENGLISH...

Страница 2: ...2...

Страница 3: ...id from August 2013 It replaces all previous changes made to this document Content 1 About this Manual 4 2 General Information 4 3 Technical Data 4 3 1 Electrical Characteristics 4 3 2 Module Performa...

Страница 4: ...SF155 S SF160 S SF165 S SF170 S Nominal power Pmax 140 W 145 W 150 W 155 W 160 W 165 W 170 W Power tolerance 5 W 0 W Open circuit voltage Voc 107 0 V 107 0 V 108 0 V 109 0 V 110 0 V 110 0 V 112 0 V S...

Страница 5: ...hould not exceed 7 A under any circumstances UL Modules installed in parallel will be provided with the listed maximum series fuse as specified 3 5 Mechanical Data Dimensions L x W x H 1 257 x 977 x 3...

Страница 6: ...5 31 1 225 31 1 225 30 12 13 5 35 35 30 372 5 372 5 454 5 454 5 566 5 598 5 5 934 2 21 5 21 5 548 5 120 35 0 5 977 2 90 444 28 2 568 5 5 Mounting holes 2 x Grounding 2 x 4 4 x 8 5 4 x 6 6 Mounting hol...

Страница 7: ...circuit voltage must never exceed the maximum system voltage including in low temperature conditions Leakage currents could create a shock hazard or fire Do not disconnect operational modules or elect...

Страница 8: ...temperature range indicated in the module s technical specifications 6 3 Module Handling Instructions Do not disassemble or modify SF modules This may result in an electric shock fire or other accide...

Страница 9: ...oduction Modules can be installed horizontally landscape or vertically portrait Maintain a space between SF modules and the roof This will allow air to circulate cooling the module and allowing conden...

Страница 10: ...0 Pa 50 lbs ft2 to the front and back of the module UL 1 600 Pa 33 4 lbs ft2 to the front and back of the module 1 5 times the design load is applied to the module during UL testing 2 400 Pa 50 lbs ft...

Страница 11: ...inimum TUV 2 400 Pa 50 lbs ft2 to the front and back of the module UL 1 600 Pa 33 4 lbs ft2 to the front and back of the module 1 5 times the design load is applied to the module during UL testing 2 4...

Страница 12: ...module overlap min 8 mm 8 mm 3 mm 3 mm 256 mm 75 mm 745 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 745 mm 256 mm 75 mm 75 mm 75 mm 75 mm Array Installation section Landscape...

Страница 13: ...g cautions Be aware of the necessary grounding requirements prior to installation Your local authorities can help you further Install arrestors surge absorbers or any other appropriate lightning prote...

Страница 14: ...r Cables drooping from the terminal box are hazardous and must be avoided Cables should be secured so they are not exposed to direct sunlight such as behind the module The sum of Voc of modules in ser...

Страница 15: ...ny other hard materials use only soft cloths or sponges for removing dirt from the SF modules surface When replacement parts are required be sure the installer servicer uses parts specified by the man...

Страница 16: ...iafilmplatz 8 82031 Gr nwald bei M nchen Germany Tel 49 89 92 86 142 0 Italy Solar Frontier Europe GmbH Sede Secondaria per l Italia Via Domenico Cotugno 49 A scala B 70124 Bari Italy Tel 39 080 90 21...

Отзывы: