background image

12

Array installation (section)

Module parallel to support rails

 

For alternative mounting methods, please consult Solar Frontier.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Array Installation (section) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Landscape (horizontal) 

Portrait (vertical) 

 

Middle clamp 

Module   

support rail 

 

Bolt   

End clamp 

Module 

Module 

Module 

Module 

Module 

Module to rail overlap,

 

min 10 mm 

10 mm   

10 mm 

 

Nut 

Nut 

8 mm   

Clamp to module overlap, 

min 8 mm 

8 mm   

3 mm   

3 mm

 

256 mm 

75 mm 

745 mm 

75 mm 

75 mm  75 mm 

75 mm 

75 mm 

75 mm 

75 mm 

75 

m

m

 

75 

m

m

 

75 

m

m

 

75 

m

m

 

745 

m

m

 

256 

m

m

 

75 

m

m

 

75 

m

m

 

75 

m

m

 

75 

m

m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Array Installation (section) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Landscape (horizontal) 

Portrait (vertical) 

 

Middle clamp 

Module   

support rail 

 

Bolt   

End clamp 

Module 

Module 

Module 

Module 

Module 

Module to rail overlap,

 

min 10 mm 

10 mm   

10 mm 

 

Nut 

Nut 

8 mm   

Clamp to module overlap, 

min 8 mm 

8 mm   

3 mm   

3 mm

 

256 mm 

75 mm 

745 mm 

75 mm 

75 mm  75 mm 

75 mm 

75 mm 

75 mm 

75 mm 

75 

m

m

 

75 

m

m

 

75 

m

m

 

75 

m

m

 

745 

m

m

 

256 

m

m

 

75 

m

m

 

75 

m

m

 

75 

m

m

 

75 

m

m

 

Содержание SF140-S

Страница 1: ...Solar Frontier Europe GmbH Data Sheet and Installation and Maintenance Manual SF140 S SF145 S SF150 S SF155 S SF160 S SF165 S SF170 S ENGLISH...

Страница 2: ...2...

Страница 3: ...id from August 2013 It replaces all previous changes made to this document Content 1 About this Manual 4 2 General Information 4 3 Technical Data 4 3 1 Electrical Characteristics 4 3 2 Module Performa...

Страница 4: ...SF155 S SF160 S SF165 S SF170 S Nominal power Pmax 140 W 145 W 150 W 155 W 160 W 165 W 170 W Power tolerance 5 W 0 W Open circuit voltage Voc 107 0 V 107 0 V 108 0 V 109 0 V 110 0 V 110 0 V 112 0 V S...

Страница 5: ...hould not exceed 7 A under any circumstances UL Modules installed in parallel will be provided with the listed maximum series fuse as specified 3 5 Mechanical Data Dimensions L x W x H 1 257 x 977 x 3...

Страница 6: ...5 31 1 225 31 1 225 30 12 13 5 35 35 30 372 5 372 5 454 5 454 5 566 5 598 5 5 934 2 21 5 21 5 548 5 120 35 0 5 977 2 90 444 28 2 568 5 5 Mounting holes 2 x Grounding 2 x 4 4 x 8 5 4 x 6 6 Mounting hol...

Страница 7: ...circuit voltage must never exceed the maximum system voltage including in low temperature conditions Leakage currents could create a shock hazard or fire Do not disconnect operational modules or elect...

Страница 8: ...temperature range indicated in the module s technical specifications 6 3 Module Handling Instructions Do not disassemble or modify SF modules This may result in an electric shock fire or other accide...

Страница 9: ...oduction Modules can be installed horizontally landscape or vertically portrait Maintain a space between SF modules and the roof This will allow air to circulate cooling the module and allowing conden...

Страница 10: ...0 Pa 50 lbs ft2 to the front and back of the module UL 1 600 Pa 33 4 lbs ft2 to the front and back of the module 1 5 times the design load is applied to the module during UL testing 2 400 Pa 50 lbs ft...

Страница 11: ...inimum TUV 2 400 Pa 50 lbs ft2 to the front and back of the module UL 1 600 Pa 33 4 lbs ft2 to the front and back of the module 1 5 times the design load is applied to the module during UL testing 2 4...

Страница 12: ...module overlap min 8 mm 8 mm 3 mm 3 mm 256 mm 75 mm 745 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 75 mm 745 mm 256 mm 75 mm 75 mm 75 mm 75 mm Array Installation section Landscape...

Страница 13: ...g cautions Be aware of the necessary grounding requirements prior to installation Your local authorities can help you further Install arrestors surge absorbers or any other appropriate lightning prote...

Страница 14: ...r Cables drooping from the terminal box are hazardous and must be avoided Cables should be secured so they are not exposed to direct sunlight such as behind the module The sum of Voc of modules in ser...

Страница 15: ...ny other hard materials use only soft cloths or sponges for removing dirt from the SF modules surface When replacement parts are required be sure the installer servicer uses parts specified by the man...

Страница 16: ...iafilmplatz 8 82031 Gr nwald bei M nchen Germany Tel 49 89 92 86 142 0 Italy Solar Frontier Europe GmbH Sede Secondaria per l Italia Via Domenico Cotugno 49 A scala B 70124 Bari Italy Tel 39 080 90 21...

Отзывы: