![Softing FG-200 HSE/FF Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/softing/fg-200-hse-ff/fg-200-hse-ff_user-manual_1312374069.webp)
Chapter 9 - Appendix
Version EN-112021-1.30.3
69
9. Make sure that the redundancy link interface cable is connected before plugging in the power terminal
block.
If the replaced FG-200 is powered while the serial link is missing, it will behave like an independent,
non-redundant primary device. If in this case the FG-200 has a valid (possibly unknown) configuration,
it might use H1 node addresses which are already in use on the H1 links. This will disturb or interrupt
communication and application processing on the H1 links.
10. Plug in the power terminal block. The boot process and the download of the configuration
information take about 1 minute. For indication of proper operation as a secondary device refer to
.
57
Содержание FG-200 HSE/FF
Страница 1: ...Softing Industrial Automation GmbH FG 200 HSE FF Modbus User Manual Version EN 112021 1 30 3...
Страница 49: ...Chapter 6 Using the web interface Version EN 112021 1 30 3 49...
Страница 56: ...FG 200 HSE FF Modbus User Manual 56 Version EN 112021 1 30 3...
Страница 76: ...FG 200 HSE FF Modbus User Manual 76 Version EN 112021 1 30 3 10 ATEX Type Examination Certificate...
Страница 77: ...Chapter 10 ATEX Type Examination Certificate Version EN 112021 1 30 3 77...
Страница 78: ...FG 200 HSE FF Modbus User Manual 78 Version EN 112021 1 30 3...
Страница 79: ...Chapter 11 UL Certificate of Compliance Version EN 112021 1 30 3 79 11 UL Certificate of Compliance...
Страница 81: ...Chapter 12 Declarations of conformity Version EN 112021 1 30 3 81...