Chapter 3 - Interface
© Softing Industrial Automation GmbH
9
3.3
Pullups and pulldowns
Weak pullups are provided on all GPIO pins. Pullups for TDO and TDI are not included on the CommModule
MBP and must be included on the application base board (pullup to Pin 7 of CommModule MBP).
RXD7_P92: internal pulldown 33k
3.4
Flash programming and debugging interface
The following signals of the microcontroller are required for flash programming.
See the commModule MBP Evaluation Kit manual for details. The usage of this interface is detailed in
document "E1/E20 Emulator – additional document for User’s Manual (RX User System Design) from
Renesas".
Signal Name
Description
14-pin Renesas Fine
Interface
TDO
Not required for debugging.
Only used for internal flash programming with
Renesas Flash Programmer
5
TDI
Not required for debugging.
Only used for internal flash programming with
Renesas Flash Programmer
11
FINEC
Programming Interface
1
FINED
Programming Interface
7
PC7
Programming Interface
10
#RESET
Programming Interface
13
GND
Ground
2, 12, 14
3V15
Internal supply voltage
8
EMLE
Programming Interface
4
CAUTION
The memory blocks are reserved for the firmware. They must not be modified as this will
invalidate the software license and damage the commModule MBP. Only programming project
files provided by Softing shall be used to reprogram the module.
3.5
Fault Disconnect Equipment
External fault disconnect equipment (FDE) can be optionally added using the assigned FDE pins.
If not in use, connect signal FDE_PO to FDE_PI and signal FDE_NO to FDE_NI.
3.6
Simulate enable
Fieldbus conformance testing requires switching the application to simulation mode.
Simulation mode is enabled by signaling low on pin SIM_EN_P31.
For the registration of the final device by the FieldComm Group this signal must be accessible to the
fieldbus testing personnel.
Содержание Data Flow commModule MBP
Страница 1: ...Softing Industrial Automation GmbH commModule MBP Hardware Manual Version EN 022018 1 00...
Страница 22: ...commModule MBP Hardware Manual 22 Softing Industrial Automation GmbH 8 1 ATEX EC type examination certificate...
Страница 23: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 23...
Страница 24: ...commModule MBP Hardware Manual 24 Softing Industrial Automation GmbH...
Страница 25: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 25...
Страница 26: ...commModule MBP Hardware Manual 26 Softing Industrial Automation GmbH...
Страница 27: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 27 8 2 IECEx Certificate of Conformity...
Страница 28: ...commModule MBP Hardware Manual 28 Softing Industrial Automation GmbH...
Страница 29: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 29...
Страница 30: ...commModule MBP Hardware Manual 30 Softing Industrial Automation GmbH...
Страница 31: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 31...
Страница 32: ...commModule MBP Hardware Manual 32 Softing Industrial Automation GmbH...
Страница 33: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 33...
Страница 34: ...commModule MBP Hardware Manual 34 Softing Industrial Automation GmbH...
Страница 35: ...Chapter 8 CE Compliance Softing Industrial Automation GmbH 35 8 3 Declaration of Conformity...