ABOUT THIS MANUAL
6
SOFAR 1100...3300TL-G3
1.3
Scope
This product manual describes the installation, electrical connection,
commissioning, maintenance and fault elimination procedures of the
SOFAR 1100...3300TL-G3
inverters.
1.4
Target group
This manual is intended for specialist electrical engineers who are
responsible for the installation and commissioning of the inverter in
the PV system, as well as the PV system operators.
1.5
Symbols used
This manual contains information on safe operation and uses symbols
to ensure the safety of persons and property as well as the efficient
operation of the inverter. Please read through the following symbol
explanations carefully in order to prevent injury or property damage.