4. Installation
Installation notes
4.1. Installation Process
Fig.4-1 Installation flowchart
4.2. Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation.
Therefore, check the outer packing materials before installing the inverter. Check
the outer packing materials for damage, such as holes and cracks. If any damage is
found, do not unpack the
HYD 5-20KTL-3PH
and contact the dealer as soon as
possible. You are advised to remove the packing materials within 24 hours before
installing the
HYD 5-20KTL-3PH
inverter.
Do NOT install the HYD 5-20KTL-3PH on flammable material.
Do NOT install the HYD 5-20KTL-3PH in an area used to store
Flammable or explosive material.
Dager
The enclosure and heat sink are very hot while the inverter is
working, therefore do NOT install the HYD 5-20KTL-3PH in places
where you might touch them inadvertently.
Caution
Consider the weight of HYD 5-20KTL-3PH when transporting and
moving the inverters.
Choose an appropriate mounting position and surface.
Assign at least two persons to install the inverter.
Attention