![SNOWJOE iON24SB-CT-RM Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/snowjoe/ion24sb-ct-rm/ion24sb-ct-rm_operators-manual_1310386009.webp)
8
Unpacking
Carton Contents:
• Cordless snow blower with lower handle
•
Upper handle assembly
• Safety key (2)
• Handle knob (4) + bolt (4)
• Chute crank knob + retainer
• Chute crank + cotter pin
• Discharge chute assembly
• Chute clean-out tool
• Chute U-bolt (2) + nut (4)
• Shear bolt (2) + nut (2) (Extras)
• Wrench
• Hex key
• Manual with registration card
NOTE:
In order to operate this snow blower, you will need
iONMAX 40V System batteries and charger. See page 23
for battery options and specifications.
1. Carefully remove the cordless snow blower and check to
see that all of the above items are supplied.
2. Inspect the product carefully to make sure no breakage or
damage occurred during shipping. If you find damaged or
missing parts, DO NOT return the unit to the store. Please
call the Snow Joe
®
+ Sun Joe
®
customer service center at
1-866-SNOWJOE (1-866-766-9563).
NOTE: Do not discard the shipping carton and packaging
material until you are ready to use the electric snow
thrower. The packaging is made of recyclable materials.
Properly dispose of these materials in accordance with
local regulations or save the packaging for long-term
product storage.
IMPORTANT! The equipment and packaging material are
not toys. Do not let children play with plastic bags, foils
or small parts. These items can be swallowed and pose a
suffocation risk!
Assembly
m
WARNING!
To avoid serious personal injury, read and
understand all safety instructions provided.
m
WARNING!
Unpacking and assembly should be
completed on a flat and stable surface, with adequate space
for moving the machine and its packaging.
Tools and supplies required:
•
Wrench (included)
• Hex key
(included)
•
Tire gauge
Assembling the Handles
m
WARNING!
Observe the lower rear area of the snow
blower and be careful not to damage cable sleeve when
rotating the handle upward.
1. Rotate the handlebars into operating position.
2. Slightly spread the upper handle assembly down over
the lower handle until it slides into position. Secure the
connection using the 4 handle knobs and bolts, and
tighten on each side (Fig. 1).
Chute Crank Assembly
1. Install the chute crank knob with the chute crank retainer
to the upper handle, leaving the two nuts in position over
the chute crank retainer. Make sure the knob is tightened
(Fig. 2).
Fig. 1
Upper
handle
assembly
Spread the
upper handle
Handle
knob +
bolt
Lower
handle
Cable
sleeve
(BACK VIEW)
Fig. 2
Chute
crank
retainer
Chute
crank knob
Содержание iON24SB-CT-RM
Страница 26: ...25 NOTES...
Страница 28: ...snowjoe com...