© Trynex International 2009 L1102
5 — 30
Optimum Flow Kit Diagram and Instructions
Model # OFK-020
.y
t
Q
n
o
it
p
ir
c
s
e
D
.
o
N
t
r
a
P
y
e
K
4
t
u
N
k
c
o
L
'
'
8
/
3
4
2
1
4
D
D 6160 3/8'' - 16x2 Hex Bolt
4
4
1
2
1
1
1
1
1
1
1
1
2
r
o
t
a
r
b
i
V
0
8
-
C
D
1
6
1
6
D
D 6579 Vibrator Backing Plate 1
h
c
ti
w
S
f
f
O
/
n
O
4
8
1
6
D
e
s
u
F
p
m
A
0
1
3
3
2
6
D
D 6234 Butt Connector
D 6344 Dielectric Grease
D 6403 20' Universal Harness
D 6404 10' Battery Harness
D 6406 Rubber Switch Boot
r
e
d
l
o
H
e
s
u
F
5
2
4
6
D
l
a
n
i
m
r
e
T
g
n
i
R
5
0
1
7
D
D 7106 Spade Connector
1
D 6578 Opti-Flow Baffle
(+) Pos.Red
(–) Neg. Black
(–) Neg. Black
(+) Pos.Red
12 VOLT
BATTERY
Wiring Installation and Instructions
Step 1:
First, install switch at desired location. This will determine
what the proper wire length should be.
Step 2:
Run spreader/vehicle harness from the rear of vehicle to
switch area. Remove approx. 3'' of the black outer jacket exposing
two single leads (red and black), strip a 1/4'' off each lead. Crimp
1/4'' female connector on red lead and crimp the butt connector to
the black lead. Place the female spade/red wire to the on/off switch
and leave the black wire for the next step.
Step 3:
Route the power harness from the battery to the switch;
this will determine proper length to cut wires. Repeat step #2
regarding cable jacketing and connection points to the switch and
butt connector.
Step 4:
Install an inline 10 amp. fuse on the positive (red) lead from
the battery to the switch. Locate an easily accessible place, out of
the elements, for the fuse and remove approx. 3'' of the black outer jacket exposing two single leads (red and black). Cut the
red lead in half and strip a 1/4'' off each lead. Insert into the fuse connector and crimp. Insert 10 amp. blade fuse into connector.
Step 5:
At the battery end of the power harness, remove 8'' of the black outer jacket exposing two single leads (red and black).
Strip 1/4” off each lead. Crimp a 3/8'' lug terminal to each lead and attach the red lead to the positive side of the battery and the
black lead to the negative side of the battery.
Step 6:
Locate vibrator approx. 6" to 8" from the top of throat entry and drill four 3/8" holes in rear hopper face. Bolt the vibrator
in place using nuts and bolts provided, with backing plate inside hopper.
IMPORTANT:
It is imperative that the vibrator backing plate is
used (see page 5-29) . Use of any other method could cause
hopper to tear.
See Page 5-29
Содержание Vee Pro 3000
Страница 8: ...Trynex International 2009 L1102 5 8 Side and Bottom View Model SP 3000...
Страница 9: ...Trynex International 2009 L1102 5 9 Side and Bottom View Model SP 6000...
Страница 11: ...Trynex International 2009 L1102 5 11 Main Assembly Parts Breakdown Model SP 3000...
Страница 13: ...Trynex International 2009 L1102 5 13 Main Assembly Parts Breakdown Model SP 6000...
Страница 15: ...Trynex International 2009 L1102 5 15 Spinner Drive Assembly Parts Breakdown Model SP 3000 SP 6000...
Страница 18: ...Trynex International 2009 L1102 5 18 Assembly View Model SP 3000 SP 6000...
Страница 39: ...THIS PAGE INTENTIONALLY LEFT BLANK Trynex International 2009 L1102 5 39...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK Trynex International 2009 L1102 5 40...
Страница 41: ...THIS PAGE INTENTIONALLY LEFT BLANK Trynex International 2009 L1102 5 41...