8
INSTALLING THE FEEDER CONTROL CABLE
ASSEMBLY
1. Uncoil the cable assembly.
3. With the proper size wrench
attach the gas fitting to the gas
terminal (located on the front
of the feed unit).
4. Connect the control plug (female
pins)onto the control recep-
tacle (INPUT) and tighten (lo-
cated on the front of the feed
unit).
5. Plug the power plug into the
positive (+) terminal(located
on the front of the welding
machine).
6. Connect the control plug (male
pins) onto the control recep-
tacle (OUTPUT)and tighten (lo-
cated on the front of the welding
machine).
SHIELDING GAS CONNECTIONS
1. Place a cylinder of the appro-
priate shielding gas in the rack
at the rear of the machine and
secure it with the chain pro-
vided.
FIG. 6. FCA-15X FEEDER CABLE ASSEMBLY
GAS
FITTING
CONTROL
PLUG
(FEMALE
PINS)
CURRENT
LUG
CONTROL
PLUG
(MALE
PINS)
POWER
PLUG
CURRENT
CABLE
FEED
CABLE
ASSEMBLY
GAS HOSE
2. Insert the current lug through
the hole on the front of the feed
unit and with the proper size
wrench fasten it to the input
current stud, located on the
back side of the drive bracket.
CONTROL
CABLE
FIG. 7. CABLE CONNECTION TO FEED UNIT
FEED
UNIT
TO GAS
TERMINAL
TO CURRENT
STUD
INPUT
CURRENT
STUD
CABLE
HOLE
DRIVE
BRACKET
TO
CONTROL
RECEP-
TACLE
(INPUT)
FIG. 8. CABLE CONNECTION TO
WELDING MACHINE
WELDING
MACHINE
TO CONTROL
RECEPTACLE
(OUTPUT)
TO (+)
TERMINAL
(STANDARD)