© SMP (PLAYGROUNDS) LTD, TEN ACRE LANE, THORPE, EGHAM, SURREY, TW20 8RJ
ZINGO X-012
Page 35
42) Connect the Link Net (item 35) to the Rope Net Mounting Brackets (item 14) using 8 off Coupling Links (item
47).
43) Connect the Link Net (item 35) to the Ground Fixing Chain Assembles (item 37) previously cemented into the
ground using 4 off Coupling Link (item 47). Tension the Link Net by removing all excess links before
connecting. See FIG.53 & 54.
44) Attach in 2 places 1 off Panel Fixing Rail (item 11) and 1 off Fixing Rail - Dashboard (item 13) to the Clamp
Rings. Each end of the fixing rails is held between a Bar Socket Top (item 46) and a Bar Socket Bottom (item
45) using 2 off BHCS Fixings (item 75) and should be fixed with the plastic panel fixing inserts on the outside
of the structure. See FIG.55 & FIG.C.
i)
For assembly method see Note 4.4, 3), i) to v).
FIG.53
35
47
37
FIG.54
FIG.55
600 CRS
13
11
ISSUE B
Содержание ZINGO MAGIA X-012/P
Страница 2: ...INTENTIONALLY LEFT BLANK ...