Page 21
10) Place 1 off Straight Leg - 1200 deck (item 1), Datum leg (as seen in FIG.12), into appropriate foundation and
shim as required to ensure the leg is plumb and square and with the welded F.S.L. mark at the correct level.
See FIG.2 & 16.
11) Place 1 off Straight Leg - 1200 deck (item 1), (as seen in FIG.14), into appropriate foundation for the second
tower and shim as required to ensure the leg is plumb and square and with the welded F.S.L. mark at the
correct level. See FIG.2 & 16.
12) Fill the hole with concrete to the required level. Ensure that a full volume of concrete is used. The top of the
concrete should gradually (1:100) slope down & outwards locally from the equipment upstand to the required
level to form a watershed.
13) The concrete should be completely cured before continuing with the installation.
14) Place 1 off Straight Leg - 1200 deck (item 1) (as seen in FIG.12) into appropriate foundation and connect each
to Deck Frame (item 2) at 1200 deck height using 1 off 1/2” x 1” BHCS fixing (item 73) and T5 washer (item
57) via Deck Support Casting (item 43). See FIG.2, 3, 15 & 16.
15) Place 1 off Straight Leg - 1200 deck (item 2) (as seen in FIG.14) into appropriate foundation and connect to
Deck Frame (item 2) at 1200 deck height using 1 off 1/2” x 1” BHCS fixing (item 73) and T5 washer (item 57)
via Deck Support Casting (item 43). See FIG.2, 3, 15 & 16.
16) Shim the 2 legs as required ensuring that they are plumb and square and orientated correctly with the welded
F.S.L. mark at the correct level. See FIG.2, 15 &16.
FIG.15
57
73
2
FIG.16
(AS SEEN IN FIG.14)
(AS SEEN IN FIG.12)
STRAIGHT LEG - 1200 DECK
(ITEM 1) (AS SEEN IN FIG.12)
FIRST POSITION
(AS SEEN IN FIG.14)
3622 POST CENTRES