-40-
No. ZK2-OM01301
12) Mount the connector for all stations to the junction box B. (Refer to
Fig.3
)
(Engage the recess of the connector and the protrusion of the junction box B. (Refer to
Fig3-A
)
13) Mount the junction box B to the junction box A. Push the wires down the side and mount the junction box
B to the junction box A following a decreasing mark tube numbers from U side.
(Do not let the lead wire get caught.)
14) Assemble the valve assembly. (Tightening torque: 0.15 Nm)
15) For products with a switch, mount the switch assembly.
(Be careful not to drop the O-ring. Tightening torque: 0.08 to 0.10 Nm)
7.3. Component Parts
No.
Item
Material
Remarks
1
End plate D assembly
PBT
HNBR, NBR and steel are also used
2
End plate U assembly
PBT
Electroless nickel plated brass, steel and NBR are also used
(10)