![SMC Networks ZK2 A Series Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/smc-networks/zk2-a-series/zk2-a-series_operation-manual_1299193025.webp)
-24-
No. ZK2-OM01301
■
Continuous duty
If a supply valve is energized continuously for a long time, the rise in temperature due to heat-up of the coil may
cause a decline in solenoid valve performance, reduce service life, or have adverse effects on peripheral
equipment. When the energizing time per day is longer than non-energizing time, use the self-holding function
of valve type R. (Energized time should be 20ms or longer, and be as short as possible.)
■
Air leakage
Zero air leakage is not guaranteed for the supply valve or release valve. Be aware that because there is a
chance of air and vacuum leakage, the pressure may change if the V port side is tightly sealed.
■
Electrical wiring
. Wiring
(1) Individual wiring
To install the connector, hold the cover and insert the connector straight pushing the connector lever with your
finger. Ensure that the connector lever clip is properly inserted onto mating part.
To remove the connector, hold the cover and pull out the connector straight pushing the connector lever clip.
Note) Do not pull the lead wire excessively, as this damage the connector or cover.