Operation and Maintenance Manual (DTR) iSWAY
®
Set of products
Version 1.8 of 2.2021
48
•
Step 1.
At the beginning, the telescopic duct is screwed directly to the wall as shown in figure 11.11.
Respectively the outer part of the ventilation duct and then the inner part.
Fig. 11.11. Installation of a telescopic duct in a brickwork wall.
The duct should be mounted with screws to the wall supporting elements. For item 1 marked in
figure 11.11 use screws with heads not higher than 4mm. Self-drilling screws marked as 2 should
be screwed around the entire circumference into existing holes in the duct. Screws 2 are included
in the delivery. Two self-drilling screws must be screwed into the hat profiles
⌀
6.3x16 in the
existing holes on both sides of each hat profile, drill through two telescopic duct sheets. Screws
are included in the delivery. The assembly is shown on fig. 11.12.
Fig. 11.12. Mounting the hat profile to the telescopic duct.
•
Step 2.
After the duct has been installed, the air intake has to be screwed in from the outside of the
building. Drill holes in the flange
⌀
6.5 at ~300mm spacing. Use sheet-metal screw in the air intake
⌀
5.5 with a minimum length of 16mm by connecting the intake flange with the telescopic duct
flange. Use a PES 10x10 gasket between the flanges to seal the joint. Gasket are included in the
delivery. Assembly of the intake louver is shown on fig. 11.13.
wall
1 screw and dowel
telescopic duct
2 self-drilling screw
Hat profile
Self drilling screw
Содержание iSWAY-FC
Страница 8: ...Operation and Maintenance Manual DTR iSWAY Set of products Version 1 8 of 2 2021 8 ...
Страница 9: ...Operation and Maintenance Manual DTR iSWAY Set of products Version 1 8 of 2 2021 9 ...
Страница 153: ...Operation and Maintenance Manual DTR iSWAY Set of products Version 1 8 of 2 2021 153 Rys 15 37 MSPU User Manual ...