Operation and Maintenance Manual (DTR) iSWAY
®
Set of products
Version 1.8 of 2.2021
146
1 - a green light signal indicating power supply to the panel
2 - a red light signal indicating a failure
3 - two-position switch with a key for manual fan activation
4 - two-position, key-operated switch controlling the smoke detector lock or double intake switch
5 - two-position switch with a key controlling cancellation of SAP fire
6 - EMC cable gland - 2 pieces -
FireBUS® transmission circuits
7 - UNI pass, power supply of the panel
8 - EMC cable gland - 1 pieces - transmission to the visualisation system
9 - wall bracket
10 - diaphragm fan
11 - section number descriptions
Connection and wiring diagrams of the control panels can be found in section 13.
For FireBUS
® , the HTKSH FE180/PH90 ekw 2x2x0.8 line is applied. The correct installation of the
shielded cable in the EMC gland of the TS panel is shown below (Fig. 15.31).
Rys.15.31. Installation diagram of shielded cable in EMC cable duct.
NOTE!
In the event of a TS panel malfunction or communication loss with the iSWAY-FC, the "Collective
fault" light on the panel is displayed and the MAC-FC controller issues a fault signal to the CSP.
If TS panel malfunction is detected or communication loss, inform the SMAY service
immediately. Do not repair or replace the panel yourself. This can only be done by SMAY service
or an authorised SMAY service.
Each control panel shall be permanently fitted with a "
Control panel “TS” service manual
".
Содержание iSWAY-FC
Страница 8: ...Operation and Maintenance Manual DTR iSWAY Set of products Version 1 8 of 2 2021 8 ...
Страница 9: ...Operation and Maintenance Manual DTR iSWAY Set of products Version 1 8 of 2 2021 9 ...
Страница 153: ...Operation and Maintenance Manual DTR iSWAY Set of products Version 1 8 of 2 2021 153 Rys 15 37 MSPU User Manual ...