CONTROLLER GROUNDING REQUIREMENTS 

NOTE – For the controller to function properly it is very important to 
provide proper building ground connections to the controller.   

 

Examples of a proper building-to-controller ground connection is 
to attach the ground cable to: 

 

The street side of the incoming water main. 

 

To a grounding rod that has been driven into the pit flooring. 

 

The controller has a common ground bus terminal connection.  
 

 

 

 

All grounds need to land at this common point including building, 
motor, transformer, and filter grounds. This prevents ground loops, 
and will limit the impedance between the grounds and noise will 
be channeled back to building ground. 
  

Providing  a  proper  ground  is  mandatory  and  will  improve  the 
performance of the controller. 

 

 

Содержание Magnetek L1000A

Страница 1: ...DRIVE STARTUP MANUAL Magnetek L1000A Drive Permanent Magnet Installation www smartrise us 2601 Fair Oaks Blvd Sacramento CA 95864 916 457 5129...

Страница 2: ...le on the drawings Sheet 1 Getting Started matches the actual equipment Below is a sample table showing the important values that will affect operation Sample Sheet 1 Getting Started Motor Volts Motor...

Страница 3: ...side of the incoming water main To a grounding rod that has been driven into the pit flooring The controller has a common ground bus terminal connection All grounds need to land at this common point i...

Страница 4: ...ls K1 K2 and the secondary brake wiring if equipped to terminals J1 J2 located on the terminal block next to the M contactor Jump EB to the terminal listed in the Construction box located on Sheet 01...

Страница 5: ...s if required Pre Transfer Emergency Power Governor IMPORTANT REMOVE FACTORY WIRES ON INPUTS 521 522 o Install the Run Bug Up Down Switch to IO s 521 522 Install the Run Bug Up Down Enable switch to M...

Страница 6: ...ck off box when complete Toggle the Inspection Normal switch to the INSP position Set BYPASS TERM LIMITS to YES o On the Smartrise Machine Room controller board press the Left Arrow ESC button several...

Страница 7: ...press the enter key o Use the Up Down Arrow keys to change the word NO to YES o Use the RIGHT Arrow key and move the asterix under the word SAVE and press enter o Hit the LEFT Arrow ESC button several...

Страница 8: ...ntil the Auto Tuning display appears 4 Press ENTER key to begin setting parameters a Press ENTER key to select the value for T2 01 Set to 1 5 Save the setting by pressing ENTER 6 The display automatic...

Страница 9: ...motor nameplate press UP arrow key to confirm and get to Tuning Ready message 3 Press and hold down the M Contactor during the duration of the Auto Tune 4 Press RUN to activate Auto Tuning Auto Tuning...

Страница 10: ...ection Make sure the car is moving in the same direction as the control switch on the Run Bug o Go to Troubleshooting Wrong Direction for corrective actions At Speed Make sure that the car is moving a...

Страница 11: ...tarted If it has the proper voltage check the following a During a run command check for DC voltage between points K1 K2 and J1 J2 if 2nd brake installed Verify the voltages are also at the Brake Coil...

Страница 12: ...12 APPENDIX Terminal Locations Terminal Card location on PG card Encoder wiring terminals GND terminals Main Line terminals L1 L2 L3 Motor terminals T1 T2 T3 Brake terminal block...

Отзывы: