CONSTRUCTION – 

(Sheet 1: Construction)

 

The  following  instructions  are  from  the  job  drawings:  “Sheet  1  – 
Construction”. Refer to the job’s specific drawings for connections. 

Construction Box (Sample) 

 

 

 

 

 

 

 

24v DC connections 

 

Install  jumpers  between  M24  and  the  IOs  listed  on  “Sheet  1: 
Getting Started – Construction”. 

 

Install jumpers between M24 any additional IO’s (if required): 

* Pre-Transfer   

 

* Emergency Power 

* Governor 

 

IMPORTANT! REMOVE FACTORY WIRES ON INPUTS 521/522

 

o

 

Install the Run Bug Up/Down Switch to IO’s 521/522

 

 

Install the Run Bug Up/Down Enable switch to M24

 

120v AC connections 

 

Install the temporary run switch between 120 and terminal SF1 
and 120 to THL/MHL/BHL terminals on the DIN rail. 

 

Install  a  jumper  between  EB  and  the  terminal  listed  on  the 
drawings on “Sheet 1: Getting Started – Construction”.

 

 

 

24VDC 
connections to 
SRU board IOs 

120VAC 
connections to 
DIN Rail 
terminals 
Emergency 
brake power 

Содержание Magnetek L1000A

Страница 1: ...DRIVE STARTUP MANUAL Magnetek L1000A Drive Permanent Magnet Installation www smartrise us 2601 Fair Oaks Blvd Sacramento CA 95864 916 457 5129...

Страница 2: ...le on the drawings Sheet 1 Getting Started matches the actual equipment Below is a sample table showing the important values that will affect operation Sample Sheet 1 Getting Started Motor Volts Motor...

Страница 3: ...side of the incoming water main To a grounding rod that has been driven into the pit flooring The controller has a common ground bus terminal connection All grounds need to land at this common point i...

Страница 4: ...ls K1 K2 and the secondary brake wiring if equipped to terminals J1 J2 located on the terminal block next to the M contactor Jump EB to the terminal listed in the Construction box located on Sheet 01...

Страница 5: ...s if required Pre Transfer Emergency Power Governor IMPORTANT REMOVE FACTORY WIRES ON INPUTS 521 522 o Install the Run Bug Up Down Switch to IO s 521 522 Install the Run Bug Up Down Enable switch to M...

Страница 6: ...ck off box when complete Toggle the Inspection Normal switch to the INSP position Set BYPASS TERM LIMITS to YES o On the Smartrise Machine Room controller board press the Left Arrow ESC button several...

Страница 7: ...press the enter key o Use the Up Down Arrow keys to change the word NO to YES o Use the RIGHT Arrow key and move the asterix under the word SAVE and press enter o Hit the LEFT Arrow ESC button several...

Страница 8: ...ntil the Auto Tuning display appears 4 Press ENTER key to begin setting parameters a Press ENTER key to select the value for T2 01 Set to 1 5 Save the setting by pressing ENTER 6 The display automatic...

Страница 9: ...motor nameplate press UP arrow key to confirm and get to Tuning Ready message 3 Press and hold down the M Contactor during the duration of the Auto Tune 4 Press RUN to activate Auto Tuning Auto Tuning...

Страница 10: ...ection Make sure the car is moving in the same direction as the control switch on the Run Bug o Go to Troubleshooting Wrong Direction for corrective actions At Speed Make sure that the car is moving a...

Страница 11: ...tarted If it has the proper voltage check the following a During a run command check for DC voltage between points K1 K2 and J1 J2 if 2nd brake installed Verify the voltages are also at the Brake Coil...

Страница 12: ...12 APPENDIX Terminal Locations Terminal Card location on PG card Encoder wiring terminals GND terminals Main Line terminals L1 L2 L3 Motor terminals T1 T2 T3 Brake terminal block...

Отзывы: