CONSTRUCTION – 

(Sheet 1: Construction)

 

The  following  instructions  are  from  the  job  drawings:  “Sheet  1  – 
Construction”. Refer to the job’s specific drawings for connections. 

Construction Box (Sample) 

 

 

 

 

 

 

 

24v DC connections 

 

Install  jumpers  between  M24  and  the  IOs  listed  on  “Sheet  1: 
Getting Started – Construction”. 

 

Install jumpers between M24 any additional IO’s (if required): 
* Pre-Transfer 

 

 

* Emergency Power 

* Governor 

 

IMPORTANT! REMOVE FACTORY WIRES ON INPUTS 521/522

 

o

 

Install the Run Bug Up/Down Switch to IO’s 521/522

 

 

Install the Run Bug Up/Down Enable switch to M24

 

120v AC connections 

 

Install the temporary run switch between 120 and terminal SF1 
and 120 to THL/MHL/BHL terminals on the DIN rail. 

 

Install  a  jumper  between  EB  and  the  terminal  listed  on  the 
drawings on “Sheet 1: Getting Started – Construction”.

 

 

 

Содержание Magnetek HPV900AF

Страница 1: ...DRIVE STARTUP MANUAL Magnetek HPV900AF Drive PM Motor Installation www smartrise us 2601 Fair Oaks Blvd Sacramento CA 95864 916 457 5129...

Страница 2: ...AMETER LOCATION REFERENCE ADJUST A0 DRIVE A1 Encoder Pulses Follow procedure in Axial Flux manual Pg 9 POWER CONVERT A4 Input L L Volts MOTOR A5 Rated Mtr Power Kw Rated Mtr Volts VAC Rated Exit Freq...

Страница 3: ...side of the incoming water main To a grounding rod that has been driven into the pit flooring The controller has a common ground bus terminal connection All grounds need to land at this common point i...

Страница 4: ...l blocks Jump EB to the terminal listed in the Construction box located on Sheet 01 Getting Started and connect either the rope gripper or sheave brake to EBR if installed Motor Leads Connect motor le...

Страница 5: ...ween M24 and the IOs listed on Sheet 1 Getting Started Construction Install jumpers between M24 any additional IO s if required Pre Transfer Emergency Power Governor IMPORTANT REMOVE FACTORY WIRES ON...

Страница 6: ...Check off box when complete Toggle the Inspection Normal switch to the INSP position Set BYPASS TERM LIMITS to YES o On the Smartrise Machine Room controller board press the Left Arrow ESC button seve...

Страница 7: ...to YES o Use the RIGHT Arrow key and move the asterix under the word SAVE and press enter o Hit the LEFT Arrow ESC button several times to get to the MAIN SCREEN Verify the LCD displays Construction M...

Страница 8: ...to YES but DON T PRESS THE ENTER BUTTON YET Press and hold the M contactor button in Press the Enter button on the drive to start the alignment ENCODER ALIGNMENT NON ROTATIONAL Check off box when comp...

Страница 9: ...PARAMETER DESCRIPTION CHOICES AUTOTUNE SELECT ALLOW AUTOTUNE TO RUN DISABLE ON RUN YES ROTOR ALIGN U10 PARAMETER DESCRIPTION CHOICES ALIGNMENT ALLOW ALIGNMENT TO BE PERFORMED ENABLE DISABLE BEGIN ALIG...

Страница 10: ...ions Proper Direction Make sure the car is moving in the same direction as the control switch on the Run Bug o Go to Troubleshooting Wrong Direction for corrective actions At Speed Make sure that the...

Страница 11: ...the terminal listed on Sheet 01 Getting Started If it has the proper voltage check the following a During a run command check for DC voltage between points K1 K2 and J1 J2 Verify the voltages are als...

Страница 12: ...5 that conflicts with drive software 1 Unplug the CAT5 cable from the DRIVE port on the machine room SRU board This will restore access to the HPV LCD screen 2 Go to A5 Motor Parameters Motor Poles an...

Страница 13: ...13 APPENDIX Terminal Locations Encoder wiring terminals GND terminals Main Line terminals L1 L2 L3 Motor terminals T1 T2 T3 Brake terminal block J1 J2 K1 K2 Terminal TB1 J1 J2...

Отзывы: