HAT880 SERIES DUAL POWER BYPASS CONTROLLER USER MANUAL
HAT880 Series Dual Power Bypass Controller 2019-07-11 Version1.1 Page 19 of 49
Balance Gen Hours
The genset which has the shortest running hours will be started when remote start signal is active.
During the start process, if current genset faults (power supply delay is overtime or ), close failure, load
inhibition occur, current genset is stopped immediately and start the other genset, otherwise master
genset starts until remote start is inactive.
For the system of “S1 Gens S2 Gens” to start/stop genset, it should meet following several
conditions:
1) It is active in Auto mode;
2) System type is set as “S1 Gens S2 Gens”;
3) Output port is set as “S1 genset start” and “S2 genset start”;
4) Input port is set as “S1 genset fault input”, “S2 genset fault input”, and “remote start on load”
or “remote start off load”;
5) It is need to set “S1 Gen S2 Gen Start Mode”;
6) It needs to configure and set “Genset Supply Delay”. If start mode is cycle gen start, “S1
Cycle Work Time”, “S2 Cycle Work Time” are also needed to set.
Among input ports, “S1 Genset Fault Input”, “S2 Genset Fault Input” are optional settings, Genset
faults can be judged by “Genset Supply Delay” and there is no need to inquire the fault alarm via input
port.
When S1 Gen S2 Gen start type is configured as “Not Used”, there is no genset start signals
output.
8.2.3
SCHEDULED RUN
Once “Scheduled Run” is enabled, users can set the scheduled start time. Controller will send start
signal at preset start time. Start signal will deactivated after the start delay has expired. “Scheduled
Run On Load” or “Scheduled Run Off Load” can be set.
Scheduled Run On Load:
When the input is active, genset close relay will active after genset is
normal.
Scheduled Run Off Load:
When the input is active, mains close relay will active after mains is
normal.
Circular time of Scheduled Start can be set as start monthly, weekly and daily.
Start Monthly:
start month, start date and time can be set.
Start Weekly:
Same start time of several days in a week can be set. e. g. Start the genset at 8:00 a.m.
from Monday to Friday and it keeps 10 hours.
Start Daily:
start the genset at same time everyday can be set.
8.2.4
SCHEDULED NOT RUN
Once “Scheduled Not Run” is enabled, users can set the “Scheduled Not Start” time. Start signal
will deactivated at preset time and it will be inhibited before the delay has expired.
Circular time of “Scheduled Not Run” can be set as monthly, weekly and daily.
Not Run Monthly:
not start month, not start
date and time can be set.
Not Run Weekly:
genset start at the same time in couple days of a week can be set. e. g. genset not
start at 19:00 p.m. from Monday to Friday and it keeps 12 hours.
Not Run Daily:
genset not start at same time everyday can be set.
NOTE3:
“Scheduled Not Run”
operation is prior to
“
Scheduled Run” operation.