7 Commissioning
SMA Solar Technology AG
Operating manual
STP15-25TL-30-BE-en-17
43
3. Tighten all six screws with an Allen key (AF 3) in the
order 1 to 6 (torque: 2.0 Nm ± 0.3 Nm). By
tightening the screws in the prescribed order, you
avoid warping the enclosure lid, which would keep
it from sealing correctly. Tip: If the screws fall out of
the lower enclosure lid, insert the long screw into the
lower middle hole and the five short screws into the
other holes.
4. Set the DC load-break switch to position
O
so that
both mounting screws are visible.
5. Insert the DC load-break switch firmly into the recess on the inverter. During this process, the
DC load-break switch must still be in position
O
and aligned so that the screws are positioned
over the threads.
6. Fasten the two screws using an Allen key (AF 3)
(torque: 2 Nm ± 0.2 Nm).
7. Turn the DC load-break switch to the position
I
.