6 Electrical Connection
SMA Solar Technology AG
Operating manual
STP15-25TL-30-BE-en-17
25
6
Electrical Connection
6.1
Overview of the Connection Area
6.1.1
View from Below
A
B
D
E
F
G
C
Figure 6: Enclosure openings at the bottom of the inverter
Position
Designation
A
Pin connector for the DC load-break switch
B
Enclosure opening M20 with filler plug for the connection cable of the multi-
function relay or SMA Power Control Module
C
Enclosure opening M32 with filler plug for the data cables or network cables
D
Enclosure opening M20 with filler plug for the data cables or network cables
E
Enclosure opening for the AC connection
F
Positive and negative DC connectors, input B
G
Positive and negative DC connectors, input A
Содержание 15000TL
Страница 1: ...STP15 25TL 30 BE en 17 Version 1 7 ENGLISH Operating manual SUNNY TRIPOWER 15000TL 20000TL 25000TL...
Страница 95: ......
Страница 96: ...www SMA Solar com...