
52
6463
2
2022
-
SPS-B
Fin System Interface
27. Return to FIN INSTALLATION screen and Touch SET KEEL CENTRE.
28.
Touch FLOAT - Position the fi ns manually so the aft. Edge and the fore edge are exactly the same distance from the keel. (Parallel to keel)
29.
Touch LOCK and then touch SET KEEL CENTRE when fi n positioning is completed. Touch return to proceed to STARTUP.
30. Alternative to (25): Touch AUTOMATIC FIN INSTALLATION (This will make the actuators move to outboard position automatically and locked for
fi n installation It requires that you have full system power with suffi cient shore power supply. It also requires that bleed procedure and end-stop
detection is completed.)
31.
Touch START This will make the actuators move to outboard position automatically and locked/held in outer position for fi n installation. Actuator
position is now being held by hydraulic power. Now proceed to mechanical fi n installation step 1-21. (Step 3,6 and 18 can be excluded)
32.
When the mechanical fi n installation is completed:
Touch STOP
Actuators/Fins will now move back to centre position.
Proceed to step 28.
MC_0219
MG_0271
27
29
28
30
31
32
Содержание 67B
Страница 66: ...66 6463 2 2022 SPS B MC_0037 Notes...
Страница 67: ...67 6463 2 2022 SPS B MC_0037 Notes...