
19
6463
2
2022
-
SPS-B
MG_0317
1
2 - 3
4
IMPORTANT
Clean and degrease the hull boss internally.
IMPORTANT
Do not lift or attach
lifting equipment to
the actuating
cylinders or their
rams.
IMPORTANT
Sealant must be compatible with base plate
and hull plate material. Naval architect/ Boat
builder must confirm this. Ensure to prepare
and prime the surfaces according to sealant
supplier technical data-sheet.
Mechanical Installation
MOUNTING OF THE STABILIZER ACTUATOR ASSEMBLY
1. Hull reinforcement is now completed and prepared for mounting of actuator assembly.
2. Apply a solid amount of sealant in the recess, and apply sealant inside of the hull boss.
3.
Using appropriate lifting equipment (sling) lift the Stabilizer Actuator assembly by the Top Seal Plate Cylinder Mount Arms.
4. Carefully lower the Stabilizer Actuator Assembly into the hulls reinforced frame & place in the correct orientation before laying onto the sealant
mounting surface. Utilize and attach the securing bolts to lock the correct Actuator Assembly positioning.
Apply grease on threads of the securing bolts/nuts and secure each with a locking washer and a nut. Tighten & torque load the securing bolt nuts
diagonally to avoid misalignment to 110 Nm.
MC_0261
!
Please refer to the graphic for special considerations relating to your model
!
MG_0318
1
2
Mechanical Installation
MC_0254
!
Please refer to the graphic for special considerations relating to your model
!
1. Coat the securing bolts with sealant and insert into the External Securing Plate, the Yachts hull and the Actuator Assembly and secure each with a
locking washer and a nut. Tighten & torque load the securing bolt nuts diagonally to avoid misalignment
2. Connect a ground wire from the yachts main bonding/anode system to each actuator
.
Содержание 67B
Страница 66: ...66 6463 2 2022 SPS B MC_0037 Notes...
Страница 67: ...67 6463 2 2022 SPS B MC_0037 Notes...