Jaguar Caravan Multiple and Cascading Boilers

7

6. VENTING REQUIREMENTS

The Jaguar J-390C is a sealed combustion type boiler, it may be
installed and vented either as a direct vent boiler which all air for
combustion is obtained directly from outside or as a non-direct
vent boiler which air for combustion is taken from inside the boiler
room. 

The Jaguar J-390C boiler must be vented by 4" diameter
PVC/CPVC schedule 40 pipe, or the proper 4” diameter stainless
steel venting system (see “vent material” on this page) through the
roof or sidewall.

FLUE GAS VENTING REQUIREMENTS

The Jaguar J-390C series boiler is a high efficiency, mechanically
forced draft boiler and, therefore, require different venting arrange-
ments than natural draft, lower efficiency boilers.

THE FOLLOWING INSTRUCTIONS MUST BE CAREFULLY
READ AND FOLLOWED IN ORDER TO AVOID ANY HAZ-
ARDOUS CONDITIONS DUE TO IMPROPER INSTALLATION
OF THE AIR INTAKE AND FLUE GAS VENTING SYSTEM.

The vent piping installation MUST be in accordance with these
instructions and with ANSI Z223.1-latest edition NATIONAL FUEL
GAS CODE, Part 7, Venting of Equipment. Other local codes may
also apply and must be followed. Where there is a conflict
between these requirements, the more stringent case shall apply.

The use of a vent damper is NOT permitted on this boiler series.

ADDITIONAL REQUIREMENTS FOR THE COMMONWEALTH

OF MASSACHUSETTS

When the Jaguar is installed and used in the Commonwealth of

Massachusetts, the following additional requirements pursuant to

Massachusetts code 248 CMR MUST be met:

(1).  Exisiting chimneys shall be permitted to have their use continued when a

gas conversion burner is installed, and shall be equipped with a manual reset

device that will automatically shut off gas to the burner in the event of a sus-

tained back-draft.

(2)(a).  For all side wall horizontally vented gas fueld equipment installed in

every dwelling, building or structure used in whole or part for residential pur-

poses, including those owned or operated by the Commonwealth and where

the side wall exhaust vent termination is less than seven (7) feet above finsi-

hed grade in the area of the venting, including but not limited to decks and

porches, the following requirements shall be satisfied:

1.  INSTALLATION OF CARBON MONOXIDE DETECTORS.  At the time of

installation of the side wall horizontal vented fueled equipment, the installing

plumber or gasfitter shall observe that a hard wired carbon monoxide detector

with an alarm and battery back-up is installed on the floor level where the gas

equipment is to be installed.  In addition, the installing plumber or gasfitter

shall observe that a battery operated or hard wired carbon monoxide detector

with an alarm is installed on each additional level of the dwelling, building or

structure served by the side wall horizontal vented gas fueled equipment.  It

shall be the responsibility of the property owner to secure the services of qual-

ified licensed professionals for the installation of hard wired carbon monoxide

detectors.

a.  In the event that the side wall horizontally vented gas fueld equipment is

installed in a crawl space or an attic, the hard wired carbon monoxide detector

with alarm and battery back up may be installed on the next adjacent floor

level.

b.  In th event that the requirements of this subdivision can not be met at the

time of completion of installation, the owner shall have a period of thirty (30)

days to comply with the above requirements; provided, however, that during

said thirty (30) day period, a battery operated carbon monoxide detector with

an alarm shall be installed.

2.  APPROVED CARBON MONOXIDE DETECTORS.  Each carbon monox-

ide detector as required in accordance with the above provisions shall comply

with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3.  SIGNAGE.  A metal or plastic identification plate shall be permanently

mounted to the exterior of the building at a minimum height of eight (8) feet

above grade directly in line with the exhaust vent terminal for the horizontally

vented gas fueled heating appliance or equipment.  The sign shall read, in

print size no less that one-half (1/2) inch in size, 

“GAS VENT DIRECTLY

BELOW, KEEP CLEAR OF ALL OBSTRUCTIONS”.

4.  INSPECTION.  The state or local gas inspector of the side wall horizontally

vented gas fueled equipment shall not approve the installation unless, upon

inspection, the inspector observes carbon monoxide detectors and signage

installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

(b) EXEMPTIONS.  The following equipment is exempt from 248 CMR

5.08(2)(a)1 through 4:

1.  The equipment listed in Chapter 10 entitled “Equipment Not Required

TO Be Vented” in the most current edition of NFPA 54 as adopted by the

Board; and

2.  Product Approved side wall horizontally vented gas fueled equipment

installed in a room or structure separate from the dwelling, building or

structure used in whole or part for residential purposes.

VENT AND AIR INTAKE MATERIALS

The vent and air intake system for direct or non-direct vent instal-

lation must be 4” diameter PVC/CPVC schedule. 40 pipe, or UL

listed single wall 4” diameter AL29-4C* stainless steel material.

The following manufacturers’ systems are approved for use within

a specified minimum and maximum equivalent vent length in this

manual.

When joining the various components of the listed stainless steel vent

systems, the manufacturers’ instructions should be closely followed to

insure proper sealing. Use sealant specified by vent system manufac-

turer for sealing of pipe and fittings, if required. When joining the

PVC/CPVC pipe and fittings, follow the instructions provided in this

manual. All connections must be liquid and pressure tight. DO NOT

use  galvanized flue pipe or any plastic-type materials other than

PVC/CPVC Schedule 40.

* Maximum exhaust vent length = 100 feet

* Maximum air intake length = 100 feet

* Each elbow is eqivalent to 10 feet of straight pipe

Manufacturer

Type/System

Sealant

Heat-Fab. Inc.

Saf-T Vent

EZ Seal

Not Required

ProTech System,

Inc.

FasNSeal

Not Required

Flex-L International

Inc.

StaR-34

GE-IS806

Metal-Fab, Inc.

Corr Guard

Not Required

N/A

PVC pipe,

Schedule 40

PVC primer

and cement

N/A

CPVC pipe,

Schedule 40

CPVC primer

and cement

Содержание Jaguar Caravan J-390C Series

Страница 1: ...rdance with the National Electrical Code ANSI NFPA No 70 latest edition and all local electri cal codes The unit must be electrically grounded if an external power source is used In Canada the install...

Страница 2: ...830130000 Jaguar boilers may also be used in a heating system with a Caravan cast iron modular boiler system Since high efficiency con densing boilers only condense when the return water temperature i...

Страница 3: ...er temperature BOILER DESIGN DATA Max ASME Working Pressure 50 PSI Power Requirements 120 Volts 60 Hz 1 Phase 1 6 Amps per module not including primary circulator No of Boilers Model No L inches 1 2 3...

Страница 4: ...talled on or above carpeting All boiler components should be protected from water during installation set up operation and service Minimum clearances to combustible materials should comply with local...

Страница 5: ...Jaguar Caravan Multiple and Cascading Boilers 5 Figure 2 Typical layout of 3 Jaguar Boilers using Slant Fin Headers Minimum Clearance...

Страница 6: ...construction fully caulked and weatherstripped INSTALLATION IN ENCLOSED BOILER ROOM REQUIRES TWO UNOBSTRUCTED OPENINGS FOR PASSAGE OF AIR INTO THE BOILER ROOM A NON DIRECT VENT INSTALLATION 1 Air dra...

Страница 7: ...xide detectors a In the event that the side wall horizontally vented gas fueld equipment is installed in a crawl space or an attic the hard wired carbon monoxide detector with alarm and battery back u...

Страница 8: ...ting system installation If stainless steel vent sys tems are used follow the manufacturer s instructions in conjunction with these instructions I Non Direct Vent Installation The air for combustion i...

Страница 9: ...Jaguar Caravan Multiple and Cascading Boilers 9 Wall opening for Slant Fin vent air intake termination Height 5 3 4 Width 12 3 4 Wall thickness 3 to 14 Figure 4...

Страница 10: ...Jaguar Caravan Multiple and Cascading Boilers 10 Figure 5...

Страница 11: ...ove snow line or grade if it does not snow in area boilers are located No minimum horizontal distance between outlets or inlets Exhaust termination to extend beyond air intake prevent condensation fro...

Страница 12: ...Jaguar Caravan Multiple and Cascading Boilers 12 Figure 7...

Страница 13: ...and Cascading Boilers 13 Figure 8 Direct Venting and Air Intake Through a Roof Knowledge of local conditions will reveal the maximum height that repeated snowfalls accumulate to This height should be...

Страница 14: ...ness Replacing the medium on an annual basis is recommended or refer to the manufacturer s instructions for systems that are available for neutralizing condensate COMMONWEALTH OF MASSACHUSETTS SPECIAL...

Страница 15: ...10 shows typical field piped primary loops for Jaguar Multiple boiler systems Each Jaguar boiler shall be installed with a manual reset Hi Limit and a Manual Reset Low Water Cutoff being located on t...

Страница 16: ...rs 16 Figure 11 shows water primary piping using Slant Fin headers Each Jaguar boiler shall be installed with a manual reset Hi Limit and a Manual Reset Low Water Cutoff being located on the boiler si...

Страница 17: ...proceed as follows a Follow the building plans find total length of straight pipe between supply from gas meter and boiler gas header b Using data in Table 2 calculate equivalent linear length of scr...

Страница 18: ...2 700 4 700 9 700 63 130 245 500 760 1 450 2 300 4 100 8 300 56 115 215 440 670 1 270 2 000 3 600 7 400 50 105 195 400 610 1 150 1 850 3 250 6 800 46 96 180 370 560 1 050 1 700 3 000 6 200 43 90 170 3...

Страница 19: ...ure as well as determining what Jaguar boilers should operate and what their fuel input should be For details on wiring and programming using this method go to Section 10 on page 19 of this manual 2 U...

Страница 20: ...onnections Reversed polarity will cause boiler lockout Proper grounding is critical for boiler operation 10 1 2 Boiler circulator Connect boiler circulator to terminal 19 and 20 if the system is for s...

Страница 21: ...Jaguar Caravan Multiple and Cascading Boilers 21 Figure 14...

Страница 22: ...Jaguar Caravan Multiple and Cascading Boilers 22 Figure 15...

Страница 23: ...Follower boiler s in b A mode Master address is 1 and Followers addresses are 2 to 8 2 Select space heating option in c t mode of the Master boiler Mode 0 1 or 2 may be selected If mode 1 or 2 system...

Страница 24: ...perature space heating mode 1 or 2 Settable from 16 F to 122 F steps of 1 F The default value is 86 F Changing compensation slope space heating mode 1 or 2 Settable from 0 1 to 5 0 steps of 0 1 The de...

Страница 25: ...170 160 120 110 100 80 90 200 S l o p e 4 0 S l o p e 3 0 Slope 0 1 min S l o p e 2 0 Slope 0 5 S l o p e 1 2 S lo p e 5 0 m a x 40 S l o p e 1 5 S l o p e 1 0 d e f a u l t S l o p e 1 8 Maximum wate...

Страница 26: ...no func tion and are disabled 10 10 BOILER OPERATION STATUS Mode Display shows status of boiler operation Temperature Display shows water temperatures lockout error or warning conditions See table 7...

Страница 27: ...display shows system supply water Temp Domestic hot water mode Temperature display shows system supply water Temp Frost protection mode Temperature display shows system supply water Temp Lockout Alar...

Страница 28: ...resume normal operation Error Condition Temperature display indicates the error code Warning Condition Temperature display indicates the error code NOTE Blinking dot on Mode Display indicates active h...

Страница 29: ...No 1 or terminal 8 9 boiler No 2 or terminal 10 11 boiler No 3 or terminal 11 12 boiler No 4 See figures 20 and 21 11 1 4 Boiler DHW and system circulators connection See Tekmar application brochure A...

Страница 30: ...000 IS REQUIRED 0 10V DC EXTERNAL SIGNAL TEKMAR CONTROL 275 TERMINAL 7 8 BOILER 1 OR 8 9 BOILER 2 OR 10 11 BOILER 3 OR 11 12 BOILER 4 SEE TEKMAR CONTROL MANUAL D275 AND A275 WHITE BLACK HOT NEUTRAL 1...

Страница 31: ...TEMPERATURE DISPLAY Boiler is on stand by mode Temperature display shows boiler supply water Temp Heating mode Temperature display shows boiler supply water Temp Frost protection mode Temperature disp...

Страница 32: ...oper combustion at both max and min input firing rates If combustion is within the range specified on page 37 of J 390C manual clean or replace spark ignitor check power supply voltage and grounding 0...

Страница 33: ...lace the sensor 11 Water Outlet Sensor Shorted Replace the sensor 12 Water Inlet Sensor Shorted Replace the sensor 13 Flue Gas Sensor Shorted Replace the sensor 15 System Sensor Shorted Check wires go...

Страница 34: ...d have a red colored connector Check that the pumping flow direction is correct 51 Reset Button Error Try turning power supply off and on again If error returns replace the display board 52 Boiler Mod...

Страница 35: ...s at 130F This load is used to size the condensing boiler used in the hybrid system Slant Fin does publish residential baseboard and commercial radiation output ratings down to 110F water temperature...

Страница 36: ...Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 5921 Canada Slant Fin LTD LTEE Mississauga Ontario www slantfin com Slant Fin Corp 2011 Printed in the U S A 611 Publication No CJ 10 HWG Figure 22...

Отзывы: