TURBINE INSTALLATION
Please follow the instructions supplied
with your turbine.
Secure turbine to turbine rail via hatch
at bottom of fuselage. Leave gap of
25mm between NGV and tailpipe.
Run all turbine wires and power cables
on opposite side of servo wires.
Always secure all wires in harness. I
would suggest you install a FOD. This
will save you money in the long run.
Install fuel pump close to UAT. We recommend to make use of a mechanical shut
off valve as well.
Secure all Festo pipes with cable ties. Make sure fuel filter and gas canister are
mounted vertical.
Install NiCad or LiPo battery in nose next to LG. I always put a fuse holder inline
with power cable.
Locate 6 x 2mm screws to hold turbine cover in position.
P-21
Assembly & Operation Manual
Photo 50
Photo 51
Photo 52