
MAT-MA 0014_GB SECUPIN
22/02/2018
page 5 of 14
5.2 Assembly instruction SECUPIN SPA-TYPE-1-L
1
Comply with assembly instructions and approval information
(ETA-99/0011) of the fixtures.
Create a drilled hole with a hole diameter d
o
= 12mm and a hole
depth h
1
≥
90mm perpendicularly to the surface of the anchoring
ground.
2
Then, remove the cuttings, e.g. by blowing them out.
3
Force the anchor into the anchoring ground through the 4 designed
penetration holes in the anchoring point using a hand-held hammer or
machine setting tool.
4
Assemble the anchoring point.
5
Use a calibrated torque spanner to apply a torque of 50Nm.
6
IDENTIFICATION
The SECUPIN permanent anchor point is labelled with the manufacturer logo and all relevant data on the anchor eyelet
Artikel- Nr.
Serien- Nr.
Referenz- Nr.
Personen-
Nutzeranzahl
MAT-2499/
MAT-2500
oder MAT-2501
Zulassungs- Nr.
Warnhinweise
Содержание SECUPIN SPA-TYP-1-L
Страница 15: ...MAT MA 0014_DE SECUPIN Stand 22 02 2018 Seite 14 von 14 13 NOTIZEN ...
Страница 29: ...MAT MA 0014_GB SECUPIN 22 02 2018 page 14 of 14 13 Notes ...
Страница 43: ... Industry born Sports driven 13 NOTE ...
Страница 57: ...MAT MA 0014_FR SECUPIN 22 02 2018 Seite 14 von 14 13 REMARQUES ...
Страница 71: ...MAT MA 0014_ES SECUPIN Versión 22 02 2018 Página 14 de 14 13 NOTAS ...
Страница 85: ...MAT MA 0014_NL SECUPIN 22 02 2018 Pagina 14 van 14 13 AANTEKENINGEN ...
Страница 99: ...MAT MA 0014_FI SECUPIN Tila 22 02 2018 Sivu 14 14 13 Huomautuksia ...
Страница 113: ...MAT MA 0014_SE Tryckdatum 22 02 2018 Sida 14 14av 13 Anmärkningar ...