Operator’s Responsibility
Section 4 – Pre-operation
Section 4 – Pre-operation
4.1 Operator’s Responsibility
It is the responsibility of the operator, prior to each
work shift, to perform the following:
1. Visual and Daily Maintenance Inspections
▪
are designed to discover any damage of
components before the MEWP is put into
service.
▪
are done before the operator performs the
function tests.
WARNING
Failure to locate and repair damage, and discover
loose or missing parts may result in an unsafe
operating condition.
2. Function Tests
▪
are designed to discover any malfunctions
before the MEWP is put into service.
IMPORTANT
The operator must understand and follow the step-
by-step instructions to test all MEWP functions.
The operator should make a copy of the Operator’s
Checklist (see
Section 4.4
) and fill out the visual
and daily maintenance inspections and the function
tests sections while performing the items outlined in
Section 4.2
and
Section 4.3
.
IMPORTANT
If MEWP is damaged or any unauthorized variation
from factory-delivered condition is discovered,
MEWP must be tagged and removed from service.
Repairs to the MEWP may only be made by qualified/
competent repair personnel. After repairs are
completed, the operator must perform visual and daily
maintenance inspections & function tests again.
Scheduled maintenance inspections shall only be
performed by a qualified/competent person.
Содержание SJ85AJ
Страница 1: ...OPERATING MANUAL SJ85AJ ARTICULATING BOOMS 208932AEA November 2018 AS...
Страница 4: ...208932AEA SJ85AJ 4 Notes...
Страница 18: ...208932AEA SJ85AJ 18 Notes...
Страница 62: ...208932AEA SJ85AJ 62 Notes...
Страница 68: ...208932AEA SJ85AJ 68 Notes...
Страница 69: ...SJ85AJ 208932AEA 69 Section 7 Technical Diagrams Specifications...
Страница 78: ...208932AEA SJ85AJ 78 Notes...
Страница 102: ...208932AEA SJ85AJ 102 Notes...
Страница 104: ...208932AEA SJ85AJ 104 Notes...
Страница 105: ......
Страница 106: ...www skyjack com...