208932AEA
SJ85AJ
42
Section 4 – Pre-operation
Visual & Daily Maintenance Inspections
4.2-8 Platform Assembly
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all fasteners are securely in place.
▪
Ensure fall protection anchorage(s)
1
are
secure and there is no visible damage.
▪
Ensure all railings
2
are properly positioned
and secured.
▪
Ensure gates/drop bars
3
are in good
working order.
▪
Ensure footswitch
4
is in good working
order and has not been modified, disabled or
blocked.
5
Platform Control Console
▪
Ensure all switches/controllers are returned to
neutral.
▪
Ensure there are no loose or missing parts and
there is no visible damage.
6
Manuals
▪
Ensure a copy of operating manual and other
important documents are enclosed in manual
storage box.
1.
Check to be sure manual storage box is
present and in good condition.
2.
Ensure manuals are legible and in good
condition.
3.
Always return manuals to the manual storage
box after use.
4
2
3
1
1
5
6
Содержание SJ85AJ
Страница 1: ...OPERATING MANUAL SJ85AJ ARTICULATING BOOMS 208932AEA November 2018 AS...
Страница 4: ...208932AEA SJ85AJ 4 Notes...
Страница 18: ...208932AEA SJ85AJ 18 Notes...
Страница 62: ...208932AEA SJ85AJ 62 Notes...
Страница 68: ...208932AEA SJ85AJ 68 Notes...
Страница 69: ...SJ85AJ 208932AEA 69 Section 7 Technical Diagrams Specifications...
Страница 78: ...208932AEA SJ85AJ 78 Notes...
Страница 102: ...208932AEA SJ85AJ 102 Notes...
Страница 104: ...208932AEA SJ85AJ 104 Notes...
Страница 105: ......
Страница 106: ...www skyjack com...