22
SJ30AJE, SJ30ARJE
196274AF
Section 1 – Scheduled Maintenance
Scheduled Maintenance Inspections
7
Pothole Protection
▪
Ensure there are no visible cracks and there
are no signs of damage or deformation.
8
Battery Trays
▪
Ensure tray latches are secure and in proper
working order.
9
Battery Charger
▪
Ensure the charger is secure and shows no
visible damage.
10
Batteries
(B)
▪
Proper battery condition is essential to
good performance and operational safety.
Improper fluid levels or damaged cables and
connections can result in component damage
and hazardous conditions.
WARNING
Explosion hazard. Keep flames and
sparks away. Do not smoke near the
batteries.
WARNING
Battery acid is extremely corrosive. Wear proper
eye and facial protection as well as appropriate
protective clothing. If contact occurs, immediately
flush with cold water and seek medical attention.
▪
Check the battery cases for damage.
B - Frequent Inspection
▪
Clean the battery terminals and cable ends
thoroughly with a terminal cleaning tool or wire
brush.
▪
Ensure all battery connections are tight.
▪
If applicable, check the battery fluid level.
B - Frequent Inspection
▪
If the plates are not covered by at least 13 mm
(1/2") of solution, add distilled or demineralized
water.
B - Frequent Inspection
▪
Replace the battery if it is damaged or
incapable of holding a lasting charge.
WARNING
Use original or manufacturer-approved parts and
components for the MEWP.
8
10
9
7
Содержание SJ30AJE
Страница 1: ...SERVICE MANUAL ARTICULATING BOOM 196274AF November 2018 ANSI CSA CE AS KC SJ30AJE SJ30ARJE ...
Страница 4: ...4 SJ30AJE SJ30ARJE 196274AF Notes ...
Страница 10: ...10 SJ30AJE SJ30ARJE 196274AF 5 7 1 Lubrication 188 ...
Страница 45: ...45 SJ30AJE SJ30ARJE 196274AF Section 3 System Component Identification and Schematics ...
Страница 68: ...A B C D E F G H V Z Y X W 68 SJ30AJE SJ30ARJE 196274AF ...
Страница 128: ...128 SJ30AJE SJ30ARJE 196274AF Notes ...
Страница 189: ......
Страница 190: ...www skyjack com ...