178
SJ30AJE, SJ30ARJE
196274AF
Section 5 – Procedures
Base
5.
After selecting the node and the sub-node numbers, proceed making the connection by clicking the
Start
button in the main window. The status LED in the lower part of the window indicates successful operation,
while the central part of the window contains information concerning the software version, node number,
nominal battery voltage and current, the hour counter and finally, alarms (if present).
Содержание SJ30AJE
Страница 1: ...SERVICE MANUAL ARTICULATING BOOM 196274AF November 2018 ANSI CSA CE AS KC SJ30AJE SJ30ARJE ...
Страница 4: ...4 SJ30AJE SJ30ARJE 196274AF Notes ...
Страница 10: ...10 SJ30AJE SJ30ARJE 196274AF 5 7 1 Lubrication 188 ...
Страница 45: ...45 SJ30AJE SJ30ARJE 196274AF Section 3 System Component Identification and Schematics ...
Страница 68: ...A B C D E F G H V Z Y X W 68 SJ30AJE SJ30ARJE 196274AF ...
Страница 128: ...128 SJ30AJE SJ30ARJE 196274AF Notes ...
Страница 189: ......
Страница 190: ...www skyjack com ...