Mid Size & Full Size RT’s
Engine Powered
February 2008
SKYJACK, Page 49
Refueling Procedure
Section 2 - Operation
2.11-2 Propane
wARNiNG
Follow all local and federal regulations
for propane handling.
To remove a propane cylinder:
Ensure engine and all systems are turned off and
1.
emergency stop button is depressed.
Turn propane cylinder’s main valve clockwise to
2.
shut off fuel supply to engine.
Start engine and allow it to stop naturally. Restart
3.
engine to ensure fuel lines are empty.
Disconnect hose from empty propane
4.
cylinder by detaching the coupling. Turn fitting
counterclockwise.
Loosen two propane cylinder straps by pulling
5.
up on the metal clips. Disconnect straps from
hooks.
Remove the propane cylinder.
6.
To install a propane cylinder:
Ensure engine and all systems are turned off and
1.
emergency stop button is depressed.
Place propane cylinder on bracket or in
2.
compartment.
Ensure metal peg on bracket or compartment is
3.
inserted into propane cylinder rim.
Reconnect propane cylinder straps to hooks and
4.
fasten tightly.
Attach coupler to propane cylinder and turn
5.
clockwise to tighten fitting.
Apply soap water or neutral detergent to pipe
6.
connection and cylinder.
Open valve 1/4 turn counterclockwise and check
7.
for any gas leaks.
Wipe off soap water or detergent after inspection
8.
is completed.
Open main valve fully if there are no leaks.
9.
NOTE
The aerial platform is now ready for use by
an authorized, qualified operator who has
read and completely understands all of
Содержание 7127
Страница 85: ...TM MOBILE ELEVATING PLATFORMS www skyjack com...