Section 3 - Operation
3.10 Loading/Unloading
Know and heed all national, state or territorial/provincial
and local rules which apply to your loading/unloading
of MEWP.
Only competent personnel shall operate
the MEWP
during loading/unloading.
Be sure vehicle capacity and loading equipment
hoists, chains, straps, etc., are sufficient to withstand
maximum MEWP weight shown on the serial plate on
the MEWP.
The transport vehicle must be parked on a level surface
and must be secured to prevent rolling while MEWP is
being loaded/unloaded.
3.10-1 Lifting
WARNING
Only competent rigger shall operate
machinery during lifting.
When it is necessary to lift the MEWP the following
conditions must be met:
•
The platform must be fully lowered.
•
The main power disconnect switch must be in
“ ” off position.
•
The hydraulic/electric and battery trays must be
closed and securely latched.
•
The extension platform must be retracted and
secured.
•
The platform control console must be secured to
the railings or removed.
•
The platform must be cleared of all personnel,
tools and materials.
•
The lifting/rigging must be attached to all four
lifting points as illustrated in
Figure 3-13
.
Tie down/lifting
points
Tie down/lifting
points
Figure 3-13. Tie Downs/Lifting Points
Center of
gravity
Center of
gravity
Figure 3-14. Center of Gravity
Содержание 3215 SJIII Compact Series
Страница 10: ...Page 10 December 2007 SJIII DC Electric Notes...
Страница 34: ...Page 34 December 2007 SJIII DC Electric Notes...
Страница 60: ...Page 60 December 2007 SJIII DC Electric Notes...
Страница 70: ...Page 70 December 2007 SJIII DC Electric Notes...
Страница 103: ......
Страница 104: ...Reliable lift solutions by people who care www skyjack com...