http://www.SkyhawkRC.com
http://www.SkyhawkRC.com
3). Make sure battery in sufficient power before flight, otherwise, replace a new battery.
4). During flight, please keep away from the crowd, power lines, buildings, signal tower, etc.
5). Please operate under safety taking off weight, do not use much heavy battery or more batteries to achieve
long flight time purpose.
6). Please do not take off until GPS 7 satellites (red LED indicator disappears).
7). Open GCS on android mobile and connect to aircraft, real-time monitor its working state.
Landing Gear Installation
1
)
Please put the gear side pipe inserted into the bottom T type aluminum pipe and twist M3x16mm and
M3x22mm screws.
2
)
Please put the installed pipe inserted into landing gear center board and put it on ground to keep two bottom
pipes parallel and twist center board M3x8mm screws.
3
)
Please check the landing gear manually, in normal, it can be retractable by hands smoothly.
Fuselage Installation
1
)
Remove packing materials, put the center board up, unfold the arms one by one, the arms will be locked
automatically while in right location. Please pay attention to their movement scope to avoid clipping fingers.
2
)
F900 adopts “X” type structure, the front is two red motor base. To put fuselage on landing gear horizontally
and insert quick release key and turn 90 degree in clockwise, it will be locked automatically.
3
)
Unfold GPS support and twist fixed nut to make antenna no waggle,
check the “▲” sign on GPS antenna
and make it point to the front, not deflective, otherwise, it will affect its performance while hovering.
4
)
Insert reinforced screws on center board to make arms locked better.