background image

19

SerVice anD inStallation Manual

5.1

5.1

Sensors

Sensors

5.1a replacing Sensor Battery

1. Unscrew the two allen screws about a quarter

of an inch.

2. Insert a flat bladed screwdriver in the battery

cover  notch  to  pry  the  box  away  from  the

mounting plate. The silicone seal may cause

some resistance.

3. Remove the battery by hand.
4. Remove the remaining silicone from both the

box and the mounting plate.

5. Install the new battery: insert the positive end and

then push in the direction of the positive pole.

6. Apply a non-corrosive RTV silicone all around

the edge of the mounting plate to create a new

seal without bubbles or breaks.

7. Reposition the box over the mounting plate and

screw in the hex screws. 

do not overtighten

5.

5.

MainTenanCe

MainTenanCe

1/4 in.

1

2

Hex key 5/32 in.

Flat bladed screwdriver

5

New high quality “D”
cell battery: 3.6 V lithium,
or alkaline

Figure: remove the sensor box from the mounting plate

* actual battery life will vary greatly depending on

the application, the frequency of use, the age and

quality of the battery etc.

6

RTV non-corrosive
silicone

Figure: install the new battery and reconnect the data wires

Figure: apply non-corrosive rtV silicone

IMPORTANT! 

Protect the interior of the

sensor from dirt and humidity at all times.

!

!

Note: A 3.6 volt lithium “D” cell battery will provide

about two years of battery life for a load cell, while

an alkaline “D” cell battery will provide less than

one year of battery life*. 

IMPORTANT! 

Both lithium or alkaline

batteries can be used, however lithium

battery will last about 2.5 times longer.

!

!

SkyAzul, Equipment Solutions

www.skyazul.com

301-371-6126

Содержание Trimble/LSI GM820

Страница 1: ...Trimble LSI GM820 Volvo With GS820 Display and Wireless Sensors Installation and Service Manual...

Страница 2: ......

Страница 3: ...y information which is protected by copyright and all rights are reserved No part of this document may be photocopied reproduced or translated to another language without the prior written consent of...

Страница 4: ......

Страница 5: ...tion lockout at 110 C Slope indicator show the pipelayer level d Slew indicator the arrow points toward the uphill direction The quadrant refers to the pipelayer upper body position The left side of t...

Страница 6: ...using Back next up and Down as described in password settings section and press enter alarm red lamp level All programmed and rated capacity limits and two block will generate an audible alarm when t...

Страница 7: ...e is available B0211_V1012 Sxxx zip It contains all the language packs mentioned above example if a system with the default language pack must be switched to Chinese 1 Download the language packs if i...

Страница 8: ...t be in contact with any metal object d The transmitter antenna should point to the left of the boom when viewed from the cab it should not point directly to or away from the display 2 Weld the mounti...

Страница 9: ...and clear the sensor chain and weight b Hoist slowly until the buzzer sounds Note the hoisting distance remaining this distance must be great enough to allow the operator and the lockout system if in...

Страница 10: ...t angle indication accordingly 2 4a angle calibration procedure 1 Mechanical Set up 1 Level the boom such that it is perfectly horizontal use a high quality bubble or digital angle sensor If the LMS d...

Страница 11: ...araMeter aDjuStMent 5 Use up and Down to select the angle sensor to be calibrated and press enter 6 Select 2 triM and press enter to modify 7 Use up and Down to modify the trim value example If angle...

Страница 12: ...Determine the sensor to be removed If more than one sensor of the same type has been added to the sensor list then determine the radio identification number ID of the sensor to be removed before proce...

Страница 13: ...munication with the sensor is possible and to start the wizard 4 Use up and Down to adjust the actual parts of line on the load sensor and then press enter to confirm 5 Note the units that will be use...

Страница 14: ...ed 4 Verify list and trim angle indication in the operation display They should change as shown in the picture For calibration use one of the two procedures below Minimum and maximum limits for list a...

Страница 15: ...o to menu 4 inStallation and select 4B SenSor caliBration 3 Enter the user password aza and press enter 4 Select 4B1 autoMatic caliBration WizarD 5 Use up and Down to select the trim or list sensor 6...

Страница 16: ...de the data logger analyzes the measured weight and records the peak value only One threshold per load cell must be adjusted When the weight drops by more than the peak threshold the peak weight is re...

Страница 17: ...nd will then have teh same ID It is the case for the load and anti two block A2B and for the trim list angles how to restore default factory settings It is possible to return the display to its factor...

Страница 18: ...Alternatively to the above access menu 5e digital input to see the status of the two digital input signals No 1 Mute input Off On No 2 Rigging mode input Off On System Sensors Diagnostic 1 Go to menu...

Страница 19: ...dition Verifythewireconnection RefertothePowerSupply and Lockout Connection sub section of this manual alert VeriFy White Wire ShorteD to GrounD description Voltage is not detected on the lockout wire...

Страница 20: ...on the key but its size is 0 kB Solution Did the transfer complete successfully Try again Problem The following message appears on screen during the transfer unaBle to create File replace uSB Solutio...

Страница 21: ...b Only dtl files generated by the LMS data logger can be displayed 4 3c Full report To export the full report to Excel click on the Full Report button in the tool bar table Full report column headings...

Страница 22: ...do not overtighten 5 5 MainTenanCe MainTenanCe 1 4 in 1 2 Hex key 5 32 in Flat bladed screwdriver 5 New high quality D cell battery 3 6 V lithium or alkaline Figure remove the sensor box from the moun...

Страница 23: ...e the white nylon hex bolt to the middle of the length of the new antenna 8 Coat the exposed metal foot of the new antenna with an electrical insulating compound by carefully inserting it in the mouth...

Страница 24: ...o corrosion is visible on the battery holder inside the load cell transmitter If some trace of corrosion is visible rub it off gently and put a small amount of dielectric grease on each battery holder...

Страница 25: ...length of a length sensor 3 Verify radio communication see Radio communication troubleshooting section Battery diagnostic Go to menu 5a SySteM SenSorS DiaGnoStic Select a sensor and press enter to ver...

Страница 26: ...ad length parallel 16F Sheave radius 16G Deduct 4D chart SettinGS 1 Rated capacity indicator 2 Pipelayer capacity chart interpolation 3 Out of charts default working load limit 4 Enable start section...

Страница 27: ...noStic 5a SySteM SenSorS 5B raDio netWork 5B1 RADIO NETWORk 5B2 LAST SENSORS RECEIVED 5B3 SEARCh FOR SENSORS 5B4 BIT ERROR RATE TEST 5c lockout 1 A2B AND OVERLOAD 2 FREE SWING CUT 3 MUTE INPUT 4 RIGGI...

Страница 28: ......

Страница 29: ......

Страница 30: ...2 SkyAz l Equipment Solutions www skyazul com 301 371 6126 SkyAz l Inc 16 Walnut Street Middletown MD 21769 Phone 301 371 6126 Fax 301 371 0029 info skyazul com www skyazul com...

Отзывы: