background image

17

SerVice anD inStallation Manual

Download data or upload capacity charts using a

USB  mass  storage  device  (USB  key)  without

removing the display from the pipelayer.

4.1

4.1

data logger transfer from

data logger transfer from

display

display

4.1a transfer from display to uSB

1.

Make sure there is at least 8 MB of available

space on the USB key

. Connect the USB key

in the USB port, on the left side of the display.

2. After a short delay (about 2 seconds), the “

uSB

M

enu

” shows up on the LCD.

3. Select  “

c

opy DataloG

to

uSB

”  and  press

enter

.  In  most  case,  you will be prompted to

enter a password; enter the download password

given by LSI technical support and press 

enter

.

Press 

enter

once  again  to  confirm  the  data

logger download.

4. Transfer progress is indicated on screen.
5. When  the  transfer  is  done,  “

t

ranSFer

SucceSSFul

”  will  appear.  Press 

enter

,  then

unplug the USB key.

6. The pipelayer is now ready for operation.

4.1b transfer from uSB device to pc

1. Connect the USB key to a computer.
2. The  data  logger  file  is  located  in  the  root

directory of the USB device:

LSI_MM_dd_yyyy_hh_mm_ss.dtl

”  where  the

double letters represent the time and date of the

USB transfer. The size of the file should be 8192 kB.

4.1c troubleshooting

Problem:

The file does not appear on the USB key.

Solution 1

: Did the transfer complete successfully?

Try again.

Solution 2

: Look in the root directory of the USB

key? The root directory is the folder that appears

when you open the USB key.

Problem:

The file appears on the key but its size is 0 kB.

Solution

: Did the transfer complete successfully?

Try again.

Problem:

The following message appears on screen during the

transfer: “

u

naBle to create

F

ile

. r

eplace

uSB

Solution 1

: The USB device may not work correctly.

Replace the USB device.

Solution 2

: The USB device may be in read only

mode. Allow read/write permissions.

Problem:

An error message appears on screen during the

transfer: “

e

rror

##

“, where 

##

is the error number.

Solution

: restart the LMS and try again to transfer the

file. If the trouble persists, contact LSI technical support.

Problem:

Nothing happens when the USB key is inserted into

the USB port of the display.

Solution

: Insert the USB key in the USB port, power

down and then power up the display.

4.2

4.2

Updating the display

Updating the display

If a display software update is needed or a load

chart update, follow these steps:

1. Connect the USB key to a computer and copy

the update file on the USB key.

2. Connect the USB key in the USB port.
3. After a short delay (about 2 seconds), the “

uSB

M

enu

” will show up on the LCD. Select “

G

et File

FroM

uSB

” and press 

enter

.

4. Choose  the  file  to  upload  and  press 

enter

.

Example typical file name: “

SPKG3_XXXX.820

4.

4.

USB TooL

USB TooL

LMS

USB Key

Figure: transfer charts or data logger files

CAUTION!

Before transferring (or

downloading) data logger or firmware

updates, make sure the pipelayer is stopped

and is in a safe state. The pipelayer cannot be

monitored during the download process.

!

!

IMPORTANT! 

To copy the data logger to the

USB key, a  password is required; contact LSi

technical support to get the download

password. The display id will be asked.

!

!

SkyAzul, Equipment Solutions

www.skyazul.com

301-371-6126

Содержание Trimble/LSI GM820

Страница 1: ...Trimble LSI GM820 Volvo With GS820 Display and Wireless Sensors Installation and Service Manual...

Страница 2: ......

Страница 3: ...y information which is protected by copyright and all rights are reserved No part of this document may be photocopied reproduced or translated to another language without the prior written consent of...

Страница 4: ......

Страница 5: ...tion lockout at 110 C Slope indicator show the pipelayer level d Slew indicator the arrow points toward the uphill direction The quadrant refers to the pipelayer upper body position The left side of t...

Страница 6: ...using Back next up and Down as described in password settings section and press enter alarm red lamp level All programmed and rated capacity limits and two block will generate an audible alarm when t...

Страница 7: ...e is available B0211_V1012 Sxxx zip It contains all the language packs mentioned above example if a system with the default language pack must be switched to Chinese 1 Download the language packs if i...

Страница 8: ...t be in contact with any metal object d The transmitter antenna should point to the left of the boom when viewed from the cab it should not point directly to or away from the display 2 Weld the mounti...

Страница 9: ...and clear the sensor chain and weight b Hoist slowly until the buzzer sounds Note the hoisting distance remaining this distance must be great enough to allow the operator and the lockout system if in...

Страница 10: ...t angle indication accordingly 2 4a angle calibration procedure 1 Mechanical Set up 1 Level the boom such that it is perfectly horizontal use a high quality bubble or digital angle sensor If the LMS d...

Страница 11: ...araMeter aDjuStMent 5 Use up and Down to select the angle sensor to be calibrated and press enter 6 Select 2 triM and press enter to modify 7 Use up and Down to modify the trim value example If angle...

Страница 12: ...Determine the sensor to be removed If more than one sensor of the same type has been added to the sensor list then determine the radio identification number ID of the sensor to be removed before proce...

Страница 13: ...munication with the sensor is possible and to start the wizard 4 Use up and Down to adjust the actual parts of line on the load sensor and then press enter to confirm 5 Note the units that will be use...

Страница 14: ...ed 4 Verify list and trim angle indication in the operation display They should change as shown in the picture For calibration use one of the two procedures below Minimum and maximum limits for list a...

Страница 15: ...o to menu 4 inStallation and select 4B SenSor caliBration 3 Enter the user password aza and press enter 4 Select 4B1 autoMatic caliBration WizarD 5 Use up and Down to select the trim or list sensor 6...

Страница 16: ...de the data logger analyzes the measured weight and records the peak value only One threshold per load cell must be adjusted When the weight drops by more than the peak threshold the peak weight is re...

Страница 17: ...nd will then have teh same ID It is the case for the load and anti two block A2B and for the trim list angles how to restore default factory settings It is possible to return the display to its factor...

Страница 18: ...Alternatively to the above access menu 5e digital input to see the status of the two digital input signals No 1 Mute input Off On No 2 Rigging mode input Off On System Sensors Diagnostic 1 Go to menu...

Страница 19: ...dition Verifythewireconnection RefertothePowerSupply and Lockout Connection sub section of this manual alert VeriFy White Wire ShorteD to GrounD description Voltage is not detected on the lockout wire...

Страница 20: ...on the key but its size is 0 kB Solution Did the transfer complete successfully Try again Problem The following message appears on screen during the transfer unaBle to create File replace uSB Solutio...

Страница 21: ...b Only dtl files generated by the LMS data logger can be displayed 4 3c Full report To export the full report to Excel click on the Full Report button in the tool bar table Full report column headings...

Страница 22: ...do not overtighten 5 5 MainTenanCe MainTenanCe 1 4 in 1 2 Hex key 5 32 in Flat bladed screwdriver 5 New high quality D cell battery 3 6 V lithium or alkaline Figure remove the sensor box from the moun...

Страница 23: ...e the white nylon hex bolt to the middle of the length of the new antenna 8 Coat the exposed metal foot of the new antenna with an electrical insulating compound by carefully inserting it in the mouth...

Страница 24: ...o corrosion is visible on the battery holder inside the load cell transmitter If some trace of corrosion is visible rub it off gently and put a small amount of dielectric grease on each battery holder...

Страница 25: ...length of a length sensor 3 Verify radio communication see Radio communication troubleshooting section Battery diagnostic Go to menu 5a SySteM SenSorS DiaGnoStic Select a sensor and press enter to ver...

Страница 26: ...ad length parallel 16F Sheave radius 16G Deduct 4D chart SettinGS 1 Rated capacity indicator 2 Pipelayer capacity chart interpolation 3 Out of charts default working load limit 4 Enable start section...

Страница 27: ...noStic 5a SySteM SenSorS 5B raDio netWork 5B1 RADIO NETWORk 5B2 LAST SENSORS RECEIVED 5B3 SEARCh FOR SENSORS 5B4 BIT ERROR RATE TEST 5c lockout 1 A2B AND OVERLOAD 2 FREE SWING CUT 3 MUTE INPUT 4 RIGGI...