![sitrex TR/6-S Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/sitrex/tr-6-s/tr-6-s_assembly-use-and-maintenance_1285861009.webp)
9
4) DELIVERY, CHECKING AND ASSEMBLY OF THE MACHINE
Delivery and unpacking.
The machine is delivered partially assembled in one crate and one pallet containing
the rake wheels. In the crate there are the parts to be assembled and three cardboard
boxes (marked “A”, “B”, “C” ) which contain the accessories for assembly (nuts and
bolts, couplings, pins, etc.).
On the pallet there are 9 (or 8/or 7/or 6) RH rake wheels.
All components are checked before being shipped by the manufacturer. Upon receipt
of the machine, check that the crates are in good condition and that the contents have
not been damaged during transport. If there is any damage and/or irregularities, notify
your dealer immediately.
Note: the packing materials consist of wood, plastic film, cardboard and steel
supports, and must be disposed in accordance with your local laws.
Handle the crates and pallets using forklifts that are suitable both for lifting the
weight indicated and for giving stability to the crates and pallets in consideration of
their size and shape.
Содержание TR/6-S
Страница 1: ...ASSEMBLY USE AND MAINTENANCE TR 6 7 8 9 S 10 2014 FROM SERIAL NO 255390 ...
Страница 20: ...20 ...
Страница 22: ...22 ...
Страница 24: ...24 ...
Страница 26: ...26 ...
Страница 28: ...28 ...
Страница 30: ...30 ...
Страница 32: ...32 ...
Страница 34: ...34 5 MAINTENANCE POINTS AND INSTRUCTIONS ...
Страница 36: ...36 6 ADJUSTMENT PREPARATION AND USE a ATTACHING THE MACHINE TO THE TRACTOR ...
Страница 38: ...38 b PREPARING THE MACHINE FOR FUNCTIONAL TESTS ...
Страница 40: ...40 c PREPARING THE MACHINE FOR TRANSPORT ...
Страница 44: ...44 b How to work ...