Before starting to transport the machine a series of checks and tasks must be done to
protect the safety of those who use the machine and of the persons and objects that are
on the road being traveled on, as well as to protect the machine itself from damage.
NOTE: That described above applies every time the machine is prepared for transport.
Check that the machine hitch 1 is securely attached to the tractor (see Box A) according
to that described in step “a” on pg. 36-37.
Check that the stand 4 is in the transport position (see Box B). Check that brake units 5
lets the wheels 6-12 turn freely but not uncontrollably. If the wheels 6-12 don’t turn
freely, loosen nut 7 as much as needed using wrench E; if instead it turns too freely, then
tighten nut 7 (see Box C). Check that cylinder 8 is extended (290 mm-11.4”) so that the
rake wheels 9 are raised about 380-400mm – 15 1/2” above the ground (southeast also
Box D).
Check that the front wheel 10 connected to cylinder 11 is parallel to drawbar 16. If it is
not, check the extension of cylinders 11-13. With the machine in the transport position,
cylinder 13 must be fully extended and reach the measurement of 775mm – 30.5” from
center to center. Consequently cylinder 11 must also reach the same measurement. If it
does not, use the tractor’s hydraulic system to send oil into the circuit so that cylinder 11
is also fully extended and thus brings wheel 10 connected to it into parallel with drawbar
16. If it is not possible to reach this condition, check the assembly of the various
components, check that there is enough oil in the tractor, that there are no leaks in the
hydraulic circuit, and no malfunctioning of the flow divider and/or the check valves.
NOTE: during transport wheel 10 must be parallel with drawbar 16. Wheels 6-12 must
turn freely but not uncontrollably (see Boxes C-D).
With cylinder 13 fully open (machine closed), check that the frame 14 is pressed tight
against the rubber bumper 15 so that the machine is stable during transport.
Keep in mind that during the transport, given the considerable length of this machine,
the rear side tends to move to the R or L (see box D) when changing direction of the
tractor; it can constitue a serious hazard for persons and/or objects that are in the
movement zone, therefore it is recommended that maximum caution be used.
Check that the tires 6-10-12 are at the pressure indicated.
If everything is ready, you may begin to transport the machine, keeping in mind that
which follows. The tractor must have specifications suitable for the transporting of this
machine, the driver must be fully qualified in every way to drive the tractor, and if
public roads are used, the driver must strictly observe all local traffic rules and
regulations.
c) PREPARING THE MACHINE FOR TRANSPORT.
Содержание TR/6-S
Страница 1: ...ASSEMBLY USE AND MAINTENANCE TR 6 7 8 9 S 10 2014 FROM SERIAL NO 255390 ...
Страница 20: ...20 ...
Страница 22: ...22 ...
Страница 24: ...24 ...
Страница 26: ...26 ...
Страница 28: ...28 ...
Страница 30: ...30 ...
Страница 32: ...32 ...
Страница 34: ...34 5 MAINTENANCE POINTS AND INSTRUCTIONS ...
Страница 36: ...36 6 ADJUSTMENT PREPARATION AND USE a ATTACHING THE MACHINE TO THE TRACTOR ...
Страница 38: ...38 b PREPARING THE MACHINE FOR FUNCTIONAL TESTS ...
Страница 40: ...40 c PREPARING THE MACHINE FOR TRANSPORT ...
Страница 44: ...44 b How to work ...