6. Remove the power plug by holding the plug section instead of the cord to avoid electrical shock, leakage, or fire
accident.
7. Turn off the power whenever the machine is left unattended between works.
8. In case of a power failure or black out, turn off the power to avoid damage or accident.
9. Fail to obey instructions above may cause severe injury or death to the operators.
1. Transportation
(1) When you lift or move the machine, please take the machine weight into consideration and apply a safe manner.
Refer to the specification for the information you need for transportation.
(2) Apply sufficient safety measures when lifting or moving the machine to avoid falling or dropping.
(3) To avoid unexpected accident, do not reuse the packing material for transportation.
2. Unpacking
(1) Before proceeding to unpacking, check the balance of the machine and apply necessary tools to hold the proper
position.
(2) When unpacking, follow the instruction printed on the cartoon. Be careful of the nails and chips when unpacking
from a wooden rack.
3. Installation:
3A. Table and Stand
(1) Only adopt a qualified genuine table and stand to assure the holding support. In case you need to leave the
machine on a surface temporarily for service, make sure the surface is strong enough to hold the weight.
(2) If casters are applied to the table stand, adopt casters with a locking mechanism only and lock them well to
secure the machine during the operation and service.
3B. Cable and Wire
(1) The cables and wires must comply with the specification and requirement.
(2) The cables and wires shall be free from bending or extra force. Reserve a free space of at least 30mm between
cables/wires and the moving parts.
(3) Do not apply starburst connection when wiring.
(4) All connectors must be fixed securely. And always hold the connector body when removing it.
3C. Grounding
(1) Grounding is necessary and must be done by a certified technician.
(2) Check and ensure the grounding is secured before operation.
3D. Motor
(1) The motor must comply with the specification and requirement.
(2) If there is a belt in the motor transmission, adopt or apply a proper protector to avoid entangling.
4. Before Operation
(1) Before turning on the power, make sure all the connectors, cables, and wires are free from damage, dropout, or
looseness.
PRECAUTIONS TO BE TAKEN IN VARIOUS OPERATION STAGES
Содержание BH9820
Страница 1: ...BH9820 OPERATION MANUAL...
Страница 2: ......
Страница 3: ...ENGLISH ENGLISH...
Страница 10: ...2 Effective standard for product QCYXDK0004 2016 Computerized Control System for Industrial Sewing Machine...
Страница 49: ...41 6 4 MASC511 Eyelet Buttonhole Machine System Diagram...
Страница 50: ...viii...
Страница 51: ...i...
Страница 53: ...5 1 1 2 3 4 2 1 2 3 3 1 2 3 4 1 2 3 5 EMG 1 EMG 2 3 4...
Страница 54: ...6 7 8 9 1 1 2 3 2 1 2 3 3A 1 2 3B 1 2 30mm 3 4 3C 1 2 3D 1 2...
Страница 55: ...4 1 2 3 4 5 1 2 3 4 5 6 6 1 2 3 7 1 2 3 4 5 6 7 8 8 1 2 10 3 4 5 35 35 85 5 6 7 8 9...
Страница 58: ...2 1 3 1 4 1 5...
Страница 59: ...3 2 2 1 1 2 3 4 U...
Страница 60: ...4 2 2 MASC511 MASC511 0 0 01 02 A EB012 B 1 2 3 A B...
Страница 61: ...5 2 3 2 3 1 1 1 2 3 4 5 6 ENTER 7 RESET 8 6 9 5 10 THREAD 11...
Страница 62: ...6 12 13 14 15 2 3 2 20 P01 P20 P01 P20 P01 P20 1 1 P01 P02 P20 C1 C2 C9...
Страница 66: ...10 2 4 1 2 3 4 2 P01 P02 P20 C1 C2 C9 P01 5 6...
Страница 67: ...11 6 2 4 2 7...
Страница 68: ...12 2 4 2 6 0...
Страница 69: ...13 2 5...
Страница 70: ...14 2 6 FRONT BACK FRONT BACK 2 7 Z 180 X Y Z 1 1 RESET 2 2 3 180 X Y Z...
Страница 71: ...15 3 3 1 MASC511 1 2 3 4 5 6 2 2 P01 P02 P20 C1 C2 C9 7 8...
Страница 72: ...16 3 2 1 2 3 4 5 2 2 P01 P02 P20 C1 C2 C9 6 7...
Страница 73: ...17 1 5 1 8...
Страница 74: ...18 7 3 3 3 3 1 1...
Страница 75: ...19 3 3 2 2 RESET 3 3 3 2 RESET 3 4 5 5...
Страница 76: ...20 3 4 P01 P20 9 C01 C09 9 S1 S9 P 3 P01 1 P03 C1 C1 C S1 S2 S3 S4 P01 P01 P01 P03 1...
Страница 77: ...21 C1 P01 P02 P20 C1 C2 C9 P01 2 3 4 S1 5 S1 5 P01 P01 6 P P S1 5 3 S2 4 5 S2 S1 P01 S3 S1 P01...
Страница 78: ...22 3 S4 S4 6 P03 7 6 P03 P03 1 C...
Страница 79: ...23 4 4 1 1 2 3 4 5...
Страница 80: ...24 4 2 4 3 U 1 1 U update mControl update 2 U 3...
Страница 81: ...25 2 1 U update LCDpanel update 2 U 3 4 4 U...
Страница 82: ...26 U U001 1 2 0 1 2 0 2 1 2 U051 1 1 0 800 50ms 0 U056 0 OFF 1 ON 0 1 1 0 U057 0 OFF 1 ON 0 1 1 0...
Страница 88: ...32 4 6 U 1 2 3 4 5...
Страница 91: ...35 M 005 M 006 M 007 M 008 M 009 M 010 M 011 M 012 5 3 01 02...
Страница 92: ...36 6 2 6 1 4 6 2...
Страница 93: ...37 6 3 MASC511...
Страница 94: ...38 6 4MASC511...