
63 33 632 D3446
18
D3446
.
201.02.03
.
23 07.2011
5 Transport to the installation site
Sirona Dental Systems GmbH
5.1 Transport and unpacking
Operating Instructions Sirona Dental CAD/CAM System
5
Transport to the installation site
Transport to the installation site
5.1
Transport and unpacking
Transport and unpacking
Transport and unpacking
All Sirona products are carefully checked prior to shipment. Please
perform an incoming inspection immediately after delivery.
1. Check the delivery note to ensure that the consignment is complete.
2. Check whether the product shows any visible signs of damage.
If return shipment is required, please use the original packaging for
shipment.
5.2
Installation site
Installation site
The unit is designed for desktop use and requires a level footprint of
approx. 35 x 45 cm for installation.
Make sure that suitable operating conditions are given (see section on
“Technical data“ [ → 17]).
NOTICE
Damage during transport
If the product was damaged during transport, please contact your
carrying agent.
NOTICE
Install inEos Blue in a protected area
3D image acquisition may be adversely affected by bright light.
Set the inEos Blue up so that it is not located directly in the beam path
of an extreme light source and not exposed to direct sunlight.
Содержание inEos Blue
Страница 1: ...MTKOMNN p a aL j p b _ k W b ErpF l f Operating Instructions...
Страница 51: ......