
11
If this is the Remote controlled version of the this fire then
care
is needed when removing
the burner not to damage the wiring system of the fire, you will need to remove the control
box, Heat Shield and battery holder placed at the back of the fire.
SECTION 7.1: PREPARING THE OPENING
Before installing the fire, check the flue for correct operation using a smoke pellet, all of the
smoke should be drawn up the flue and exit correctly from the terminal.
If problems are found
DO NOT
fit the fire until corrective measures have been completed.
Protect the decorative hearth whilst aligning the tray within the opening.Part of the packaging
or a dust sheet can be used.
Before running the gas supply into the opening, offer up the base plate to the fireplace to
check the fit is correct.
Drill 6mm holes through the base plate as shown in the image and fit the Rawlplugs and
screw down base plate.
Diagram 4
Diagram 5
Fixing
Positions
Содержание Eco3
Страница 16: ...16 products will have been tested with the appliance although other fire front frets will be compatible ...
Страница 20: ...20 Place the final two A coals between coals D ...
Страница 32: ...32 SECTION 20 LIST OF SPARES Eco 3 Manual Control 13 14B 11B 6B 1B 7B 8B 9B 10B 2B 15B ...
Страница 33: ...33 Eco3 Ceramics A1 A2 A3 A8 A7 A6 A5 A4 ...
Страница 34: ...34 Eco3 Ceramics 9A 10A ...