9
3.2 - CHECKING THE PACKAGE UPON RECEIPT
When the package is received, if there is no external damage, open the package and check that all the
material is inside
(see FIG. n°3)
.
If the package shows signs of mishandling, bumps or falls upon delivery, the shipping company must
be made aware of the damage within 3 days of the delivery date indicated on the documents, and a
detailed report must be written on the damage to the machine.
Do not overturn the package!!
When the
package is being moved make sure that it is firmly held in the four fundamental points (keeping it
parallel to the floor).
3.3 - DISPOSING OF THE PACKAGE
The package components (cardboard, pallets, plastic and polyurethan foam strap) are produced like solid
urban waste, therefore they can easily be disposed of.
If the machine is installed in countries with particular norms, dispose of the packages according to
the laws in force.
CHAP. 4 - INSTALLATION
4.1 - MACHINE PLACEMENT
When choosing the plane the machine will be placed on the dimensions shown in Tab. 1 must be
considered (based on the model), therefore the surfaces must be wide enough to hold it, and it must be
well-levelled and dry.
Prearrange a discharge tube (ø60 mm.) under the machine and a drain trap on the floor, or a floor grate
to collect the water or other waste material.
Furthermore the machine must be placed as near as possible to a faucet (ø12 mm.), which enables the
feeding tube to be easily and safely attached
(see FIG. n°4)
.
Once the machine is placed proceed to
blocking it by fastening it to the floor with the setscrews on the flanged feet.
Furthermore the machine must be placed in an
environment with a maximum humidity of Load ø12
75%, which is not salty and
has a temperature
b5°C and +25°C; in any case in
environments which do not bring about its
malfunctioning.
Fig. n°4 - Discharge diagram
Discharge
ø60
230
mm
120
mm
Discharge ø60
Содержание LCJ10 SC
Страница 16: ...16 ASSISTANCE CENTER AUTHORIZED RETAILER ...