© Jul 2020
3-2
GTJZ0612&0812&1012&1212 Operation Manual
ELECTRICAL SHOCK HAZARDS
•
Always maintain a safe distance
from power lines and electrical
equipment in accordance with ap-
plicable government regulations
and see
.
•
Consider platform movement,
wire swinging or drooping, be-
ware of strong winds or gusts,
and do not operate the machine
when there is lightning or heavy
rain.
•
If the machine comes into contact
with live wires, keep away from
the machine. Personnel on the
ground or on the platform must
not touch or operate the machine
until the power is switched off.
•
Do not use the machine as a
ground wire during welding and
polishing operations.
Table 3-1
Voltage
(Phase to Phase, kV)
Minimum Safe Distance
(m/ft)
0-50
3.05 (10)
50-200
4.60 (15)
200-350
6.10 (20)
350 -500
7.62 (25)
500 -750
10.67 (35)
750 -1000
13.725 (45)
TIPPING HAZARDS AND
RATED LOAD
Maximum rated load bearing capacity of the platform:
Table 3-2
GTJZ0612
Retracting
550 kg(1213 lb)
Extending: Stationary only
430 kg(948 lb)
Extending: Extension only
120 kg(265 lb)
GTJZ0812
Retracting
450 kg(992 lb)
Extending: Stationary only
330 kg(728 lb)
Extending: Extension only
120 kg(265 lb)
GTJZ1012
Retracting
320 kg(705.6 lb)
Extending: Stationary only
200 kg(441 lb)
Extending: Extension only
120 kg(265 lb)
GTJZ1212
Retracting
320 kg(705.6 lb)
Extending: Stationary only
200 kg(441 lb)
Extending: Extension only
120 kg(265 lb)
Содержание GTJZ0612
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank ...
Страница 8: ...This Page Intentionally Left Blank ...
Страница 12: ... Jul 2020 iv GTJZ0612 0812 1012 1212 Operation Manual This Page Intentionally Left Blank ...
Страница 34: ... Jul 2020 4 2 GTJZ0612 0812 1012 1212 Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION ...
Страница 55: ...TRANSPORTING AND LIFTING THE MACHINE GTJZ0612 0812 1012 1212 Operation Manual 8 3 Jul 2020 Figure 8 4 ...