
72
Procedure
E1
The phase sequence of the 3-phase power
supply
is incrorrect
1
Yes
Exchange any two of the 3 phase wires
No
Some power supply terminals are loose
2
Yes
Ensure all supply terminals are securely
fastened
No
The power supply is abnormal
Yes
Check the power supply equipment
No
Replace refrigerant system main PCB
Notes:
1. The A, B, C terminals of 3-phase power supply should match compressor phase sequence requirements. If the phase sequence is inverted, the compressor will
operate inversely. If the wiring connection of each outdoor unit is in A, B, C phase sequence, and multiple units are connected, the current difference between C
phase and A, B phases will be very large as the power supply load of each outdoor unit will be on C phase. This can easily lead to tripped circuits and terminal
wiring burnout. Therefore if multiple units are to be used, the phase sequence should be staggered, so that the current is distributed among the three phases
equally.
2. Loose power supply terminals can cause the compressor to operate abnormally and compressor current to be very large.
Содержание SCV-1400EB
Страница 2: ......
Страница 4: ...2...
Страница 8: ...6...
Страница 26: ...24...
Страница 46: ...44 1 Electric Control Box Layout For SCV 750EB For SCV 1400EB...
Страница 61: ...59 3 Wiring diagram 3 1 Single unit For SCV 750EB and SCV 1400EB...
Страница 62: ...60 For SCV 900EB...
Страница 63: ...61 For SCV 1800EB...
Страница 78: ...76 5 5 E3 E4 E5 E7 Eb Ed EE EF EP EU Fb Fd Troubleshooting Digital display output...
Страница 159: ......
Страница 160: ...0 1 234 56 0 7 8 234 0 9 1 7 1 0 6 16 3 5 9 4 260 88 4 260 88 08 88 688 0 4 08 4 6 4A8 60 B...