12.

 

Route battery-to-inverter cables (not included) through conduit (also not included) using the desired 
knockouts on the side of the BOSS.6 Enclosure. DC Positive and DC Negative cables run from the 
Enclosure’s 5-point terminal blocks to the inverter power panel of any equipment compatible with 
SimpliPhi’s batteries (refer to the Integration Guides listed in the Product 

Documentation section of 

SimpliPhi’s web page for a list of compatible equipment: 

https://simpliphipower.com/product-

documentation/). 

13.

 

Set the circuit breakers for all battery modules to the ON position. PHI batteries must be fully charged 
before commissioning. 

 

CAUTION: Turn the inverter’s main DC Disconnect on only AFTER ALL the built-in circuit 
breakers in the PHI Battery bank are turned on. (Refer to the System Commissioning 
SimpliPhi battery video.) 

 

This completes the installation procedure for the BOSS.6 Enclosure. 

 

 

Remember, all Balance of System equipment must be programmed to SimpliPhi’s specified 
settings and PHI batteries must be fully charged before commissioning the system (i.e. 
before connecting the batteries to any loads). 

 

4.0 – Care & Maintenance

 

The BOSS.6 Enclosure is designed to deliver many years of reliable service in a wide variety of 
environments. The BOSS.6 is resistant to most environmental elements, but should be isolated from 
excessive water or moisture, extreme heat, solvents, flammable materials, and environmental hazards.  

If the BOSS.6 becomes dirty or grimy, wipe it as you would any kitchen cabinet. Do not use a pressure 
washer or hose to clean the BOSS.6. 

Содержание BOSS.6

Страница 1: ...SIMPLIPHI POWER INC REV020620...

Страница 2: ...Table of Contents 1 0 IMPORTANT SAFETY INFORMATION 1 1 1 Safety Instructions 1 1 2 Limitations of Use 2 2 0 Product Description 2 2 1 Introduction 2 2 2 Overview 2 2 3 Specifications 3 3 0 Installati...

Страница 3: ...celets etc and wear insulated rubber electrical gloves when installing or performing maintenance on the BOSS 6 Enclosure or the PHI battery modules contained within 5 Before assembling or using the BO...

Страница 4: ...es Warranty 10 Verify polarity at all battery module connections with a standard voltmeter before 1 energizing the system and 2 turning the PHI Battery s circuit breaker ON OFF switch to the ON positi...

Страница 5: ...the PHI Batteries already included in the fully integrated AccESS or ExprESS units All PHI batteries must be fully charged BEFORE commissioning Failure to do so will Void the Warranty As outlined in t...

Страница 6: ...ge on the receiving document before signing for receipt of the equipment Damage claims should be filed directly with the carrier Not doing so can limit your ability to claim damage of equipment with t...

Страница 7: ...S 6 Carbon Steel Enclosure 1 2 Shelf Mounted Within the Enclosure 1 3 Built in Enclosure Vent 2 7 Built in Corrosion Resistant Equipment Cooling Fan 1 8 20 Long High Strength Steel Hex Head Screw 2 9...

Страница 8: ...wo or three PHI batteries SKU numbers BB 2 and BB 3 respectively are sold separately and may be purchased from any SimpliPhi distributor https simpliphipower com distributors o The built in 5 point te...

Страница 9: ...ltraflex Blue cables with 3 8 lugs 3 Use pairs of battery cables to wire from each PHI battery to the terminal blocks 6 total 8 AWG Arctic Ultraflex Blue cables with 3 8 lugs may be special ordered di...

Страница 10: ...s The BOSS 6 Enclosure can be installed directly adjacent to the AccESS or BOSS 6 fully integrated units Ensure that any ventilation is not blocked on the sides of the AccESS or BOSS 6 units If mounti...

Страница 11: ...s masonry bolts or carriage bolts minimum diameter 3 3 Assembling the BOSS 6 Enclosure 4 Make sure all PHI battery module circuit breakers are in the OFF position Prepare the battery modules for insta...

Страница 12: ...flat washers included with cabinet 3 8 lock washers and 11 16 stainless steel hex nuts originally included on the batteries Tighten the nuts to 160 in lbs 9 Attach positive interconnecting busbars di...

Страница 13: ...ar to terminals on a SimpliPhi battery video Figure 3 Interconnecting Busbars Attach to PHI Battery Terminals Interconnecting busbars are not included with Enclosure 10 Wire the negative interconnecti...

Страница 14: ...sbars are ordered from SimpliPhi or from a SimpliPhi distributor they will come with the 3 8 flat washers 3 8 lock washers and 3 8 16 long brass hex head screws needed to secure cables to the ends of...

Страница 15: ...The cables should include 3 8 lugs to fit onto the 3 8 posts on the 5 point terminal block iii Size the battery bussing to terminal block wires according to the number of batteries connected in paral...

Страница 16: ...ore commissioning CAUTION Turn the inverter s main DC Disconnect on only AFTER ALL the built in circuit breakers in the PHI Battery bank are turned on Refer to the System Commissioning SimpliPhi batte...

Страница 17: ...mino Del Sol Oxnard CA 93030 USA 805 640 6700 info simpliphipower com SimpliPhiPower com 15 5 0 Technical Support For technical support related to your BOSS 6 Enclosure please contact us as at 805 640...

Отзывы: