START-UP PROCEDURES
ALL SIMPLEX PROJECTORS are carefully “run-in” at the factory before shipping. No
“run-in” period at the installation site is required. Some gear whine may be noticed initially, but should
disappear after a few hours of operation.
INITIAL OILING
One quart of Simplex Projector Oil is included in the accessory kit supplied with new equipment. USE
ONLY GENUINE SIMPLEX PROJECTOR OIL IN THE MECHANISM. Use of other lubricants may
inhibit oil pump operation and damage moving parts. Additional oil is available through authorized Strong
International Dealers; order Simplex Part No. 52-00400 for one-quart quantities, 52-00410 for a half-gallon
can, or 52-00420 for a one-gallon can.
DO NOT, at any time, operate the projector without oil.
With the projector level (0° projection angle), add oil through the filler located at the front of the gear
compartment. Look into the gear compartment while adding oil; the correct amount of oil will touch the bottom
of the horizontal drive shaft. No air bubble should be visible in the sight glass inside the film compartment.
Unless the machine is operated at a severe upward angle, no air should be visible in the sight glass. If
bubbles are seen, add oil to maintain a safe level. Always check the oil level with the motor
off.
15
Rotate the motor flywheel by hand to turn the projector mechanism. It should turn freely and smoothly.
Start the projector motor and run for at least one minute. Check for an oil splash against the gear compartment
cover glass.
Normal
Add Oil
Содержание APOGEE
Страница 17: ...12 Figure B is in optimal alignment ...
Страница 35: ...30 FILM TRAP Assembly No 52 00223 ...
Страница 39: ...34 APOGEE LENS TURRET Assembly No 52 00279 ...
Страница 45: ...CONTROL CABINET Wiring Diagram 40 ...
Страница 54: ...OIL PUMP ASSEMBLY 49 ...
Страница 63: ......