49
EN
3.8
Checklist
Instructions for the installer
After completing the installation, the installer must check all the indicated points with the aid of the checklist shown below and tick the
relevant column with a √.
LIST
CHECK
COLLECTORS AND EXTERNAL PIPES
Was the support frame installed and fastened according to the instructions and the regulations currently in force?
Are the solar collectors optimally positioned and oriented?
Is there any moisture inside the solar collectors?
Were the hydraulic connections to the solar collectors made correctly?
Is there good UV protection on the thermal insulation?
Are the pipes adequately insulated?
Was the rooftop installation carried out in conformity to the regulations currently in force?
HYDRAULIC CONNECTIONS
Are there any leakages in the closed circuit, in the connections or in the heat exchanger of the pipes?
Are the safety valves adequately installed?
Is there a hot / cold water mixer valve?
ELECTRICAL CONNECTIONS
Is the heating element properly connected? (if present)
Were the electrical connections made in accordance with the regulations currently in force? (insulation, earthing, etc.)
GENERAL
Was the warranty form filled in properly and delivered to the customer?
Were the user instructions given to the user?
Was the choice of the model adequate and was it made according to the customer’s needs?
Was the customer informed of other options for the production of domestic hot water?
Содержание NATURAL 300/8.16 S
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it...